My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-09_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2011-12-09_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:19:03 PM
Creation date
12/9/2011 10:59:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
12/9/2011
Doc Name
TR 04 Post Constructn submittal of construction certificat'n & as-built drawngs for Mill Lime Slaker
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR4
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THESE RECORD DRAWINGS HAVE BEEN <br />PREPARED BASED ON INFORMATION <br />PROVIDED, IN PART, BY OTHERS WHILE <br />THIS INFORMATION IS BELIEVED TO BE <br />RELIABLE. THE ENGINEER IS NOT <br />RESPONSIBLE FOR irs ACCURACY, NOR <br />FOR ERRORS OR OMISSIONS WHICH MAY <br />HAVE BEEN INCORPORATED INTO THESE <br />DOCUMENTS. <br />ENGINEERS <br />CONSULTANTS <br />BMMGI <br />COPYRIGHT 2011 s <br />The RMH Group, Inc. <br />1250D West Colfax Avenue <br />Lakewood, Cdorado 80215 <br />Phone (303) 239 -0909 <br />Fax (303) 235 -0218 <br />MOH Job Numb.: 18222 <br />and Ma <br />do.ffo .., .1 N m omw e <br />ilihaal it. Wwv. for ao mu. b1 <br />e 8201 <br />the n. .n ..2 valid m me4uetlm .Itboot <br />oodne.<. <br />wars before proem.... ` Ob . . r o� . <br />UME SLAKER <br />PROJECT <br />HENDERSON MLL <br />19302 COUNTY RD. <br />NO.3 <br />PARSHALL, CO <br />FIRST LEVEL MISCELLANEOUS SYSTEMS PLAN <br />SCALE:1 /4' =1' -0' <br />SECOND LEVEL MISCELLANEOUS SYSTEMS PLAN <br />SCALE 1/4' =1' -0' <br />I <br />BLOWER <br />BONDED TO EXISTING �' DED TO EXISTING <br />STEEL STRUCTURE TEE LSTRUCTURE <br />FIRST LEVEL POWER AND CONTROL PLAN <br />SCALE: 1/4' =1' -0 <br />SECOND LEVEL POWER AND CONTROL PLAN <br />SCALE 1/4' =1' -0 <br />I 12 <br />RAKER <br />I <br />11 <br />l <br />I <br />SHEET NOTES <br />1. SEE EQUIPMENT SCHEDULE, SHEET E2.0 FOR CONDUIT AND CONDUCTOR REQUIREMENTS. <br />2. SEE SHEET E2.0 FORMCO AND PANEL SCHEDULES. <br />3. ALL RECEPTACLES GFI AND MOUNTED 4P AFF. <br />4. 2814 IN 5107 MOTOR CIRCUIT FROM DISCONNECT TO MCC. DISCONNECT TO SHUTDOWN <br />MOTOR CONTROL CIRCUIT PRIOR TO DISCONNECTING POWER. <br />KEY NOTES <br />O 02 BARE COPPER CONDUCTOR TO CONTROL CABINET. <br />O BhR BARE COPPER CONDUCTOR TO RAKER BELOW. <br />O 04O BARE COPPER CONDUCTOR TO TOP OF SILO. <br />O JBOXC3 MOUNTED ABOVE HMI PANEL <br />O INCOMING POWER CONDUIT MID CONDUCTORS FROM MILL TO MCCSLAKER <br />© INCOMING COMMUNICATIONS CONDUIT AND CONDUCTORS FROM MILL TO SPEAKERPHONE. <br />O INCOMING NETWORKING COIDUR AND CONDUCTORS FROM MILL TO CONTROL PANEL. <br />O GROUND CONDUCTOR BONDED TO BUILDING STRUCTURAL STEEL ANDIOR REBAR IN FOOTER <br />O 04a BARE COPPER CONDUCTOR FROM ELECTRICAL ROOM GROUND BUS TO UPPER LEVEL <br />GROUND BAR 02 BARE COPPER CONDUCTOR FROM UPPER LEVEL GROUND BUS TO <br />DISCONNECTS MID FROM DISCONNECTS TO SLAKER FRAME. <br />10 40 FEET OF 04O BARE COPPER CONDUCTOR 01 BASE OF CONCRETE WALL AND BONDED TO <br />REBAR <br />11 UPS POWER CONDUIT AND CONDUCTORS FROM MILL TO PULLBOX AND TERMINATION BLOCKS <br />FOR UPS POWER. D4' CONDUIT WITH SBI2AWG FROM PULLBOX TO EMERGENCY LIGHTING <br />RELAY AND TO CONTROL PANEL. <br />12 04O BARE COPPER CONDUCTOR 30' FROM BUILDING PERIMETER AND BURIED S'O' BELOW <br />FINISHED GRADE ENCASED IN GROUND ENHANCEMENT MATERIAL <br />13 010 BARE COPPER CONDUCTOR ENCASED IN BUILDING SLAB TO COMPLETE GROUND RING. <br />to JB0XC3 AND S3ARE SINGLE ENCLOSURE MOUNTED ON SLAXER. CONDUITS AND <br />CONDUCTORS FOR FIRST LEVEL PROCESS INSTRUMENTS FACTORY INSTALLED TO J3OXC3 <br />AND SC 200X-C3 MID S3 USED AS PASS THROUGH TO UPPER LEVEL BEAKER INSTRUMENTS. <br />This drawing together with any and all additions, correc- <br />tions, changes and alterations thereof is the property of <br />Climax Molybdenum Co. and is furnished on the express <br />condition that it sholl not be reproduced, copied, lent, or <br />disposed of directly or indirectly, nor used for any other <br />purpose than for which it is specifically furnished without <br />prior written consent of said Climax Molybdenum Co. <br />REFERENCE DRAWINGS <br />DESCRIPTION OF REVISION <br />1 <br />2 <br />3 <br />4 <br />5 <br />DATE <br />BY <br />SCALE <br />PLOT SCALE <br />INVERT OF SCALE <br />COMPUTER FILE: <br />.DWG <br />PAPER SIZE D <br />ENGINEER: <br />DRAWN BY: <br />CHECKED BY: <br />APPROVED BY: <br />APPROVED BY: <br />DATE <br />CLIMAX MOLYBDENUM COMPANY <br />19302 COUNTY ROAD No. 3 <br />PARSHALL, CO <br />(303) 569 - 3221 <br />SHEET No. <br />RUIN= - COMB <br />N3. <br />ISSUE 1 <br />ISSUE 2 <br />0103091 <br />MIN 2 <br />L1SUE 3 <br />ISSUE 4 <br />46085 <br />MR 6 <br />ISSSU1 7 <br />EX! 6 <br />2651 <br />06 -18-ID <br />06 -22 -10 <br />06 - 30 - 10 <br />08 -01 -10 <br />08 -18-ID <br />11-03 -10 <br />11 -23-10 <br />12 -17 -10 <br />01 -12 -11 <br />05-06 -I1 <br />DWG No. <br />DISCIMPI1aN <br />PERE <br />ADDONDUY 1 <br />ADD10iDUY 2 <br />CONSTRUCTION <br />FOUNDATION NEVSIONS <br />ADDITIONAL 20131093 <br />0313 <br />831 4 <br />280810 DRAMS <br />SCAM <br />PMOIICI' NA: <br />DNOIXO 111112 <br />ELECTRICAL <br />FLOOR PLANS <br />1/2 <br />231131 <br />I DRAWING N0. <br />E1.0 <br />HENDERSON MILL SITE <br />LIME SLAKER PROJECT <br />REV. Let. <br />
The URL can be used to link to this page
Your browser does not support the video tag.