Laserfiche WebLink
BAUR & ASSOCIATES <br />CONSULTING ENGINEERS <br />9 May 2010 <br />Marty Kreel <br />Climax Molybdenum Company <br />19302 County Road 3 <br />Parshall, CO 80468 <br />RE: Lime Slaker Quality Assurance (JCB Project No. 10023) <br />Dear Marty: <br />We have performed construction administration services for the above - referenced project. <br />Among the sources of quality assurance are the following: <br />• Review of shop drawings by J.C. Baur and RMH, including concrete <br />reinforcement, mix designs, structural steel, architectural elements, mechanical and <br />electrical submittals. <br />• Site observations by J.C. Baur, CTL Thompson and RMH to observe concrete <br />placement, site preparation, mechanical and electrical installations. <br />• Testing by Kumar and Associates of micropile grout, concrete and masonry <br />(including reports). <br />• Testing by CTL Thompson of complete - penetration welds (including reports). <br />Note that we did not perform quality assurance of the slaker or silo themselves. That scope <br />is the responsibility of the supplier, Stanco. <br />Based on the results of the services as described above, it is our opinion that the support <br />structure for the lime slaker was constructed in general compliance with the intent of the <br />Contract Documents. <br />Sincerely, <br />J.C. Baur & Associates, Inc. <br />Nathan E. Skillern, P.E. <br />Senior Engineer <br />2551 31st STREET <br />BOULDER, CO 80301 <br />TEL: (303) 444 -9121 <br />FAX: (303) 415 -1070 <br />