My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-09_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2011-12-09_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:19:03 PM
Creation date
12/9/2011 10:59:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
12/9/2011
Doc Name
TR 04 Post Constructn submittal of construction certificat'n & as-built drawngs for Mill Lime Slaker
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR4
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINISH SCHEDULE <br />DOOR <br />FLOOR <br />BASE <br />WALLS <br />STEEL <br />N38Nf1N NOON <br />ROOM NAME <br />31.3NONO3 O31V3S <br />3SV8 ON <br />NORTH <br />EAST <br />SOUTH <br />WEST <br />(C)O31NIYd <br />NO FINISH <br />FACTORY FINISH(2) <br />FINISH <br />IISINU ANOLOYJ <br />NSINIi ON <br />NO FINISH <br />FACTORY FINISH <br />A <br />HSINU ANOLOV4 <br />HSINU ON <br />PAINTED CNU(1) <br />7' -0' <br />BLOWER ROOM <br />• <br />• <br />• <br />STEEL <br />• <br />PAINTED <br />• <br />• <br />• <br />MCC <br />• <br />• <br />• <br />• <br />• <br />• <br />102 <br />• <br />HOLLOW METAL <br />LA <br />SKER ROOM <br />• <br />• <br />• <br />PAINT <br />• <br />STEEL <br />• <br />PAINTED <br />HW -02 <br />• <br />• <br />DOOR SCHEDULE <br />DOOR <br />FRAME <br />HRDWR.• <br />NOTES <br />NUMBER <br />TYPE <br />MATERIAL <br />WIDTH <br />HEIGHT <br />THICK. <br />FIRE <br />FINISH <br />TYPE <br />MATERIAL <br />JAMB <br />FINISH <br />101 <br />A <br />18 GA. STEEL <br />6' -0' <br />7' -0' <br />1r <br />- <br />PAINT <br />STEEL <br />PAINTED <br />HW -01 <br />102 <br />8 <br />HOLLOW METAL <br />PAIR 3-6' <br />7' -0' <br />1W" <br />- <br />PAINT <br />H.M. <br />STEEL <br />PAINTED <br />HW -02 <br />TEMP. WIRED GLASS <br />103 <br />C <br />HOLLOW METAL <br />3-0' <br />6' -8' <br />14r <br />- <br />PAINT <br />H.M. <br />STEEL <br />PAINTED <br />HW -03 <br />TEMP. WIRED GLASS <br />104 <br />C <br />HOLLOW METAL <br />3-0' <br />7' -0' <br />1% <br />- <br />PAINT <br />H.M. <br />STEEL <br />PAINTED <br />HW -04 <br />TEMP. WIRED CLASS <br />201 <br />C <br />HOLLOW METAL <br />3-0' <br />7-0' <br />1W. <br />- <br />PAINT <br />H.M. <br />STEEL <br />PAINTED <br />HW -04 <br />TEMP. WIRED GLASS <br />INSULATED METAL <br />WALL PANEL - <br />SEE 1/A3.0 <br />22 GA. GALV. <br />FLASHING <br />DRIP CAP <br />1/4' STEEL <br />CLOSURE PLATE <br />-WELD TO CHANNEL <br />WEATHER SEAL <br />A <br />INSULATED <br />OVERHEAD <br />COILING <br />OPENING HEAD DETAIL <br />A2�A4., <br />SEALANT <br />1/2' CAULK BEAD <br />OPENING HEAD <br />CHANNEL - <br />RE STRUCTURAL <br />DOOR FRAME <br />-SEE SCHEDULE <br />THIS SHEET <br />3' = 1' -0' <br />TEMPERED <br />GLASS — <br />KICK PLATE <br />6' <br />. <br />B <br />PAIR <br />HOLLOW <br />METAL W/ <br />4'X25 WIRE <br />GLASS <br />4' <br />/ <br />INSULATED METAL <br />WALL PANEL - <br />SEE 1 /A3.0 <br />EPDM WASHERED <br />FASTENER <br />1/2' CAULK BEAD <br />22 GA. GALV. <br />FLASHING <br />SEALANT <br />1/4' STEEL <br />CLOSURE PLATE <br />-WELD TO CHANNEL <br />• NOTE COORDINATE HARDWARE REQUIREMENTS WITH SECTION 08 71 00 OF THE PROJECT SPECIFICATION. <br />TEMPERED <br />GLASS <br />WEATHER SEAL <br />OPENING JAMB DETAIL <br />AT INSULATED PANEL <br />KICK PLATE-. <br />C <br />HOLLOW <br />METAL W/ <br />4'X25' WIRE <br />GLASS <br />6' <br />OPENING HEAD <br />CHANNEL - <br />RE STRUCTURAL <br />DOOR FRAME <br />-SEE SCHEDULE <br />THIS SHEET <br />= 1' -0' <br />CONCRETE WALL <br />RE STRUCTURAL <br />T/2 CAULK BEAD <br />EPDM WASHERED <br />FASTENER <br />22 GA GALV. <br />FLASHING <br />SEALANT <br />1 CMU PAINT COLOR - WHITE <br />2 FACTORY FINISH - SEE 4/A4.1 <br />3 MATCH SIDING - SEE 4/A4.1 <br />1 1 2' <br />DOOR FRAME <br />-SEE SCHEDULE <br />THIS SHEET <br />WEATHER SEAL <br />OPENING JAMB DETAIL <br />AT CONCRETE WALL <br />STEEL EXTERIOR PANEL <br />- V -UNE 32 24 GAGE <br />STEEL INSIDE UNER <br />PANEL - 18 GAGE <br />NOTE - INTERIOR AND EXTERIOR <br />WALL PANEL FINISHES TO BE KYNAR <br />500 (PVDF) KHAKI 88 PAINT <br />WALL PANEL SYSTEM TO BE <br />PROVIDED AND INSTALLED BY: <br />THE ROOFING COMPANY <br />28 TEN MILE DRIVE <br />GRANDER, CO 80446 <br />CONTACT: BRENT FJELDHEIM <br />870 -887 -0104 <br />HEATLOK SOY 200 <br />SPRAY - APPUED RIGID <br />POLYURETHANE INSULATION <br />MINIMUM R RATING = 20 <br />INSULATED METAL WALL PANEL SECTION <br />A2.0 A {.1 <br />3' <br />This drawing together with any and all additions, correc— <br />tions, changes and alterations thereof is the property of <br />Climax Molybdenum Co. and is furnished on the express <br />condition that it shall not be reproduced, copied, lent, or <br />disposed of directly or indirectly, nor used for any other <br />purpose than for which it is specifically furnished without <br />prior written consent of said Climax Molybdenum Co. <br />REFERENCE DRAWINGS <br />DESCRIPTION OF REVISION <br />2 <br />3 <br />4 <br />5 <br />DATE <br />BY <br />SCALE <br />PLOT SCALE <br />INVERT OF SCALE <br />COMPUTER FILE: <br />.DWG <br />PAPER SIZE D <br />ENGINEER: <br />DRAWN BY: <br />CHECKED BY: <br />APPROVED BY: <br />APPROVED BY: <br />DATE <br />CLIMAX MOLYBDENUM COMPANY <br />19302 COUNTY ROAD No. 3 <br />PARSHALL, CO <br />(303) 569 -3221 <br />SHEET No. <br />KO. <br />1051181 <br />ISM2 <br />MHO 1 <br />13719211 2 <br />En <br />RE <br />MI 5 <br />BB 0 <br />000014 <br />733011 <br />EMMO S — IBBU68 <br />DATE <br />05 -11-10 <br />06 -P2 -10 <br />504-10 <br />08 -0440 <br />00 -10-10 <br />1-00-10 <br />ll -24-10 <br />1247 -10 <br />01 -12-1 <br />16 -00-11 <br />DOCRIPIION <br />It1001 <br />BID <br />REAM 2 <br />ozana <br />POOHOd1f01 MEM <br />17111210 20® <br />I31 <br />691 <br />ISM 02U01113 <br />BAUR & ASSOCIATES <br />CONSULTING ENGINEERS <br />2551 31st Street Boulder, CO 80301 <br />303- 4449121 (9) 303-415-1070 (E) <br />9199..jchaur.com <br />MUMS mlm. Cm denim d W <br />rAr o m • • mm mob. sr= <br />a re valid Av l°' r r ..� ` .m ` <br />W <br />ml r w. mein, <br />IA -69 M MIA at I. le UN <br />®lrrr era. P «ra• e u. mt <br />PROJECT: <br />LIE MAKER <br />PROJECT <br />HEINIVEFEI rN PALL <br />WW2 COUNTY W RD. <br />NO.3 <br />PARSHALL, CO <br />DATE: <br />DRAWN <br />CHECKED: <br />08 -18-10 <br />/CB <br />DRAWING MTS. � <br />DETALS AND <br />SCHEDULES <br />SULK <br />PROJECT NO: <br />NOTID <br />100E3 <br />I DRAWING NO <br />A4.1 <br />HENDERSON MILL SITE <br />LIME SLAKER PROJECT <br />DWG No. <br />REV. Let. <br />
The URL can be used to link to this page
Your browser does not support the video tag.