My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-07_REVISION - C1981012 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2011-12-07_REVISION - C1981012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:54 PM
Creation date
12/8/2011 10:39:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
12/7/2011
Doc Name
Revised Page Letter
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR60
Email Name
ZTT
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINE ENGINEERING CIVIL ENGINEERING <br />MINE RECLAMATION CONST. MANAGEMENT <br />December 6, 2011 <br />Janet Binns <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: New Elk Mine Permit C- 1981 -012 <br />Technical Revision Application No. 60 <br />Development Waste Disposal Area <br />Dear Ms. Binns. <br />New Elk Coal Company, (NECC) has changed its plans regarding expansion of the development waste <br />disposal area. NECC plans to install a conveyor system that will transport development waste from the <br />east side of the development waste disposal pile to the refuse disposal area conveyor. The new temporary <br />conveyor system will be permitted under minor revision number 101. <br />This technical revision will facilitate the installation of the conveyor system. Three new culverts will be <br />installed along the proposed conveyor corridor. The haul road located north of the development waste <br />disposal area will be extended to the proposed loading point for the conveyor. The classification of an <br />access road located south of the coal preparation plan will be changed to a haul road. <br />An additional five culverts were added to Map 13. Exhibit 19(18) presents the culvert sizing rationale and <br />calculations for the new culverts. The second paragraph on page 2.05 -4a was amended to briefly discuss <br />the proposed conveyor corridor. <br />A'reclamation estimate for the three new culverts is provided as Exhibit 28. <br />Sincerely, <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Ron Thompson, NECC <br />Mike Trujillo, CDOW <br />Attachments: (3) <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7 STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />RECEIVED <br />C © %2011 <br />Divest„ „ <br />Mining and Safety <br />TR -60 Transmittal letter dated December 6, 2011 <br />TR -60 Page 2.05 -4a Revised December 6, 2011 <br />TR -60 Map 11 Sheet 1 Revised December 6, 2011 <br />TR -60 Map 13 Revised December 6, 2011 <br />TR -60 Table 21 dated December 6, 2011 (Pages 2.05 -14 & 14a) <br />TR -60 Exhibit 19(18) pages 1 through 11 dated December 6, 2011 <br />TR -60 Exhibit 28 Reclamation Estimate dated December 6, 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.