My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-09_PERMIT FILE - X200522600
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X200522600
>
2011-11-09_PERMIT FILE - X200522600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:53 PM
Creation date
12/7/2011 12:46:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200522600
IBM Index Class Name
PERMIT FILE
Doc Date
11/9/2011
Doc Name
Coal Exploration Final Reclamation Report
From
EAI
To
DRMS
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />COAL EXPLORATION FINAL RECLAMATION REPORT <br />Prospector: Northfield Partners LLC <br />Address: P.O. Box 630678 <br />Littleton, Colorado 80163 -0678 <br />This report is filed in accordance with Rule 2.02.6(3)(b) of the Regulations of the Colorado <br />Mined Land Reclamation Board for Coal Mining, adopted in accordance with the Colorado <br />Surface Coal Mining Act, C.R.S. 34 -33 -101 et seq. This report is to be submitted within 30 <br />days after the end of the period of exploration specified in the approved Notice of Intent, as <br />amended. <br />1. Attach a map showing: <br />a) <br />b) <br />c) <br />Notice of Intent No.: X- 2005 - 226- 00 -AM -1 <br />Project Name: Northfield Coal Mine <br />County: Fremont <br />Date: November 4, 2011 <br />The final locations of all holes drilled during this project; <br />the locations of all roads modified or constructed for the project; and <br />All areas significantly disturbed by the operator. <br />2. Have all disturbed areas, including drill holes, been reclaimed in accordance <br />with the approved plan and the above - referenced regulations? Yes <br />3. Were any newly constructed project roads retained for the landowner? No <br />If yes, a) attach a letter from the landowner that grants consent, b) indicate the <br />road location on a map, and c) describe the approximate specifications of the <br />road (width, length, surface material used). <br />4. Did any drill holes experience surface artesian flow conditions? No <br />If yes, locate these holes on a map and describe sealing and plugging procedures <br />that were used. <br />5. Were any drill holes converted to a water well? No If yes, list the State <br />Engineer's Well Permit Number and name and address of the user. <br />
The URL can be used to link to this page
Your browser does not support the video tag.