My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-06_REPORT - M2006078 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2006078
>
2011-12-06_REPORT - M2006078 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:52:30 PM
Creation date
12/7/2011 7:27:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006078
IBM Index Class Name
REPORT
Doc Date
12/6/2011
From
Flatiron Constructors, Inc.
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Build the Best. Be the Best. FL 71 <br />December 2, 2011 <br />Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Permit No M- 2006 -078 <br />111 Annual Fee Invoice and Annual Report <br />Flatiron Constructors, Inc. hereby submits its 2011 Annual Report for the Camenish <br />Borrow, Pit Number M- 2006 -078. Check Number 00335185in the amount of $504.00 <br />has been included for the 111 Annual Fee. <br />Stripping of overburden material and export of material from the Camenish Borrow Pit <br />began at the beginning of May 2007 for the Colorado Department of Transportation, 1 -25 <br />Widening Project No. IM- 0253 -160. Currently, all of the estimated mined material has <br />been exported from the site. Reclamation work at the pit is complete with perimeter <br />sealing from the surrounding alluvium with compacted core. A site inspection was <br />performed by the State Engineer's Office and approval given for the compacted clay <br />liner. Additional seeding and inflow channel stabilization was performed in October <br />based upon site inspection with the Division of Reclamation, Mining and Safety. <br />Changes were made to the Reclamation Plan to reflect as- constructed pit contours of <br />Gas well Setbacks and submitted with technical Revision to the Mining Plan dated <br />October 10, 2010. <br />Sincerely, <br />FLATIRON CONSTRUCTORS, INC. <br />Justin DuMond PE <br />Project Manager <br />Cc: Job File <br />Flatiron Constructors, Inc. <br />10188 E. 1 -25 Frontage Rd <br />Firestone, CO 80504 <br />303 485 4050 MAIN <br />303 485 7684 FAX <br />www.flatironcorp.com <br />An Equal Opportunity Employer A HOCHTIEF Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.