My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-06_REVISION - M2009018 (52)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009018
>
2011-12-06_REVISION - M2009018 (52)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:24:28 PM
Creation date
12/7/2011 7:27:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009018
IBM Index Class Name
Revision
Doc Date
12/6/2011
Doc Name
Conveyor Route- Follow-Up.
From
Varra Companies, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
uneven surfaces which would prevent uniform compaction. The subgrade shall then be compacted to 90% <br />to 95% or greater of ASTM D 698 or as otherwise specified. <br />PLACING FILL <br />No sod, brush, frozen material or other deleterious or unsuitable material shall be placed in the fill. The <br />select fill material shall be placed in uniform, level layers in a manner which will preclude the formation of <br />lenses and will result in a uniformly compacted fill. The thickness of each compacted lift shall be six inches <br />(6') or as specified, as determined by the capability of the compaction equipment. Each lift shall be <br />compacted to the requirements described in Compaction Requirements of this Appendix or as specified <br />otherwise. <br />MOISTURE CONTROL <br />The fill material in each layer, at the time of compaction, shall contain the amount of moisture required <br />for optimum density; and the moisture shall be uniform throughout the fill. Expansive soils may need <br />moisture above the optimum moisture content in order to pre -swell the soil as based on laboratory tests. <br />The contractor may be required to add and thoroughly mix moisture to the backfill material. If, in the <br />opinion of the Soils Engineer, the material proposed for use in the compacted fill is too wet to permit <br />adequate compaction, it shall be dried in an acceptable manner prior to placement and compaction or a <br />suitable imported fill material may be chosen. <br />
The URL can be used to link to this page
Your browser does not support the video tag.