My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-06_REVISION - M2009018 (52)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009018
>
2011-12-06_REVISION - M2009018 (52)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:24:28 PM
Creation date
12/7/2011 7:27:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009018
IBM Index Class Name
Revision
Doc Date
12/6/2011
Doc Name
Conveyor Route- Follow-Up.
From
Varra Companies, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL INFORMATION <br />The data presented herein were collected to help develop designs for this project. Professional judgements <br />on design alternatives and criteria are presented in this report. These are based on evaluation of technical <br />information gathered and partly on our understanding of the characteristics of the proposed mining <br />conveyor system. We do not guarantee the performance of the project in any respect, only that our <br />engineering work and judgements rendered meet the standard of care of our profession. Due to the ever <br />changing standards in the geotechnical field, the recommendations and design data presented in this report <br />are only valid for a 2 year period. If the project has not commenced prior to this expiration date, <br />Landmark Engineering Ltd requires that this report be re- issued utilizing current industry standards and <br />practices. <br />The test hole drill locations, chosen by the client, should provide a reasonably accurate picture of subsurface <br />conditions in those specific areas tested. However, variations from the conditions portrayed still may occur <br />at these locations and probably will occur at other untested locations. These variations are sometimes <br />sufficient to necessitate modifications in design. <br />We recommend that construction be continuously observed by personnel from Landmark Engineering Ltd., <br />so we can take advantage of all opportunities to recognize different conditions and minimize the risk of <br />having some undetected condition which might affect the performance of the foundation elements. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.