My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-01_APPLICATION CORRESPONDENCE - C2010089 (2)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010089
>
2011-12-01_APPLICATION CORRESPONDENCE - C2010089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:31 PM
Creation date
12/2/2011 8:24:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Application Correspondence
Doc Date
12/1/2011
Doc Name
Preliminary Adequacy Review No. 2
From
Western Fuels Association
To
DRMS
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX TABLE 2.04.7 -2 <br />Field Parameters and Lab Data for SW - N1 and SW - N3 <br />APPENDIX TABLE 2.04.7 - 2 <br />Field Parameters and Lab Data for SW - N213 and SW - N214 <br />SECTION 2.04.9 <br />SOILS RESOURCE INFORMATION <br />MAP 2.04.9 -3 Topsoil Salvage Map <br />SECTION 2.04.10 <br />VEGETATION BASELINE STUDY FOR THE PROPOSED NEW HORIZON NORTH MINE PERMIT AREA <br />APPENDIX TABLE 2.04.10 - 9 <br />NEW HORIZON NORTH MINE AREA <br />IRRIGATED PASTURE — PLANT COVER <br />APPENDIX 2.04.11 - 2 <br />INFO ON SAN MIGUEL RIVER WATER DEPLETION <br />SECTON 2.05.2 <br />OPERATION PLAN: Estimated Area for Life of Mine <br />MAP 2.05.2 -1 Mine Plan - Estimated Area for Life of Mine <br />SECTION 2.05.3 <br />OPERATION PLAN <br />MAP 2.05.3 -2 Equipment Corridor Plan and Profile <br />SECTION 2.05.3(3) <br />MINE FACILITIES <br />MAP 2.05.3(3) -1 Facilities Map <br />MAP 2.05.3(3) -2 Buildings and Manmade Features <br />MAP 2.05.3(3) -3 Haul Road Alignment and Details <br />APPENDIX 2.05.3(3) - 1 <br />Engineer's Certification <br />APPENDIX 2.05.3(3) - 1 <br />SEDCAD RUN FOR 10 - YEAR 24 - HOUR STORM EVENT FOR SW - FA AND SW - 1C CULVERT C - 13 <br />APPENDIX 2.05.3(3) - 1 <br />SEDCAD RUN FOR 10 -YEAR 24 -HOUR STORM EVENT FOR SW -OB, SW -1A, SW -TS CHANNEL 1 <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.