My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-01_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2011-12-01_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:40 PM
Creation date
12/1/2011 2:00:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
12/1/2011
Doc Name
Letter & Application (Emailed)
From
Mountain Coal Company
To
DRMS
Type & Sequence
MR383
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MUNTAIN COAL <br />West Elk Mine <br />P.O. Box 591 <br />5174 Highway 133 <br />Somerset, CO 81434 <br />A Subsidiary of Arch Western Bituminous Group, LLC <br />(970) 929 -2200 <br />Fax (970) 929 -5050 <br />November 30, 2011 <br />Mr. Jim Stark <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Mountain Coal Company, LLC, West Elk Mine; Permit No. C- 1980 -007; Minor <br />Revision No. MR -383, Phase 1A RPE East Buttress and Refuse Placement <br />Dear Mr. Stark: <br />Mountain Coal Company, LLC (MCC) submits this letter, application form and three drawings <br />for Minor Revision No. MR -383 to construct the initial phase (i.e. Phase 1A) of the approved <br />RPE East Phase 1 buttress (per MR -368 and TR -127) and for subsequent refuse placement. <br />No changes to the approved Phase 1 buttress or RPE East refuse pile design are proposed <br />with this revision. <br />As shown on the attached drawings, the Phase 1A rock fill portion of the buttress will be <br />constructed to elevation 6,490' and the upstream colluvium to elevation 6,535'. Then refuse <br />will be placed in the prepared area behind the buttress in compacted lifts to an elevation of no <br />more than 6,775'. MCC will continue with construction of the full Phase 1 buttress during <br />Phase 1A refuse placement. The Phase 1 rock buttress will be completed to the approved <br />design elevation of 6,520' prior to the placement of further refuse beyond the Phase 1 A refuse <br />elevation. <br />Please contact me at (970) 929 -2238 or by e -mail should you have questions regarding this <br />submittal. <br />Sincerely, <br />Kathleen G. Welt, <br />Environmental Engineer III <br />cc: Chris Nyikos — MCC <br />Joanne Williams — Gunnison Co. <br />
The URL can be used to link to this page
Your browser does not support the video tag.