My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-23_PERMIT FILE - P2011033 (3)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011033
>
2011-11-23_PERMIT FILE - P2011033 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:18 PM
Creation date
12/1/2011 8:10:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011033
IBM Index Class Name
PERMIT FILE
Doc Date
11/23/2011
Doc Name
2nd copy of NOI application form 2
From
Nuvemco, LLC
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />No significant topsoil disturbance will occur. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />The holes will be drilled by air rotary through the Salt Wash Member of the Morrison Formation. <br />Locations will be on existing roads and trails and are not yet plotted, affording the operator the <br />ab to avoid frees an minimize site preparations. Aft er yeuphysieul aria geuluyieal sample <br />to 3 feet below ground surface, and cement to the surface. Any excess drill cuttings or sample <br />piles will be raked into the surrounding ground and if necessary and soil exists, the ground will <br />be scarified and re- seeded. A 2 x 2 -inch wooden stake with a metal tag will mark the drill site <br />and the actual location will be surveyed and mapped. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />NA, none planned with this NOI <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />.. <br />e. <br />• • • • - • • _ • • - - • <br />required will be left at the request of the landowner, Mr. William Burnett. <br />
The URL can be used to link to this page
Your browser does not support the video tag.