Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />No significant topsoil disturbance will occur. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />The holes will be drilled by air rotary through the Salt Wash Member of the Morrison Formation. <br />Locations will be on existing roads and trails and are not yet plotted, affording the operator the <br />ab to avoid frees an minimize site preparations. Aft er yeuphysieul aria geuluyieal sample <br />to 3 feet below ground surface, and cement to the surface. Any excess drill cuttings or sample <br />piles will be raked into the surrounding ground and if necessary and soil exists, the ground will <br />be scarified and re- seeded. A 2 x 2 -inch wooden stake with a metal tag will mark the drill site <br />and the actual location will be surveyed and mapped. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />NA, none planned with this NOI <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />.. <br />e. <br />• • • • - • • _ • • - - • <br />required will be left at the request of the landowner, Mr. William Burnett. <br />