Laserfiche WebLink
4 (FORM 2 - Public filing) <br />11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />On existing roads and trails Nuvemco will drill sufficient holes to determine the presence or absence of <br />uranium and vanadium ore under the patented leases. Drilling will be with an air rotary drilling rig to depths <br />more than 50 holes will be open at any time, with plugging and abandonment following geophysical logging.. <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />No pads or pits will be <br />diameter, depth, location, etc... Submit additional pages if necessary: required. Drilling is by <br />A. Drill Pads: Quantity 0.00 Average Width 0.00 (ft) Average Length 0.00 (ft)air rotary on existing <br />B. Drill Holes: Quantity 500.00 Depth 400.00 (ft) Diameter 6.00 (in)ining roads and trails <br />C. Mud Pits: Quantity 0.00 Average Width 0.00 (ft) Average Length 0.00 (ft) area. <br />Average Depth 0 (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />None planned at this time <br />F. Other Disturbances (please describe): <br />None anticipated. If existing roads and trails are improved by maintenance, the land <br />owner, William Burnett, would like the improvements to remain. <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />Fuel tanks are present on Nuvemco's Monogram Mine 112d DMO, at the eastern part of the <br />patented claims. Some lubricants are kept in C -cans at that vehicle storage and staging site. <br />Exploration of the adjacent and nearby Uranus Patented NOI will utilize these facilities. Most <br />- equipment will be refueled b y pick -up buck mount fuel tank which l eave the Iuuatiun d aily <br />F. New Road(s): Length (ft) Width (ft) <br />Significantly Upgraded Road(s) Length (ft) Width (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />NA, All roads or trails currently exist as shown on the aerial photographic map in <br />Exhibits. No significant improvements are anticipated. <br />