My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-23_REPORT - C1981019
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2011-11-23_REPORT - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:18 PM
Creation date
11/30/2011 10:58:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
11/23/2011
Doc Name
3rd & 4th Quarter West Pit Fill Report and 2011 3rd & 4th Quarter South Taylor Fill Report
From
DRMS
To
Colowyo Coal Company
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 23, 2011 <br />John W. Hickenlooper <br />Governor <br />Mr. Tony Tennyson Mike King <br />Environmental Engineer Executive Director <br />Colowyo Coal Company Loretta E. Pineda <br />5731 Highway 13 Director <br />Meeker, CO 81641 <br />RE: Colowyo Coal Mine, C1981 -019, 2011 Third and Fourth Quarter West Pit Fill Report, and 2011 <br />Third and Fourth Quarter South Taylor Fill Report <br />Dear Mr. Tennyson: <br />The Division received Colowyo Coal Company's (CCC) 2011 Third Quarter West Pit Fill Report, and 2011 <br />Third Quarter South Taylor Fill Report on September 22, 2011. The 2011 Fourth Quarter West Pit Fill <br />Report and 2011 Fourth Quarter South Taylor Fill Report was received on October 20, 2011. Submittal of <br />these reports is in compliance with Rule 4.09.1(11)(b). <br />South Taylor Fill: <br />The third quarter 2011 inspection was conducted by registered engineer, Mr. Thomas Peterson, on <br />September 19, 2011. A -A' underdrain construction is reported to be complete. The operator is in the <br />process of placing fill over the A -A' underdrain. B -B' underdrain is complete, and fill has been placed over <br />the drain. C -C' underdrain is complete. C -C' drain has been covered with spoil. At the C -C' area bench <br />7800, and bench 7850 are completed, while bench 7900 and bench 7950 continue to receive fill material. <br />No structural problems were identified in the third quarter report. <br />The fourth quarter 2011 inspection was conducted by registered engineer, Mr. Thomas Peterson, on October <br />19, 2011. A -A' underdrain construction is reported to be complete. The operator is in the process of <br />placing fill over the A -A' underdrain. B -B' underdrain is complete, and fill has been placed over the drain. <br />C -C' underdrain is complete. C -C' drain has been covered with spoil. At the C -C' area bench 7800, and <br />bench 7850 are completed, while bench 7900, bench 7950, and bench 8000 continue to receive fill material. <br />No structural problems were identified in the fourth quarter report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.