My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-28_REVISION - C1980007 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2011-11-28_REVISION - C1980007 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:25 PM
Creation date
11/29/2011 9:59:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
11/28/2011
Doc Name
Completeness letter (Emailed)
From
DRMS
To
Town of Paonia
Type & Sequence
SL4
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />November 28, 2011 <br />Townofpaonia @tds.net <br />Town of Paonia <br />P.O. Box 460 <br />Paonia, CO 81428 <br />Re: West Elk Mine (Permit No. C- 1980 -007) <br />Revision: SL -4 <br />SL -4 Seeks Phase II Release of 67.6 Acres <br />Dear Sir or Madam: <br />The Division of Reclamation, Mining and Safety has received a revision for the West Elk Mine. The <br />revision was called complete on November 25, 2011. <br />The Mountain Coal Company, LLC (MCC) has submitted a Partial Phase II Bond Release for the West <br />Elk Mine. The Bond Release application is for lands reclaimed between 1996 and 2007, including vent <br />shafts locations, drill holes, drill pads and roads. The specific sites are listed in the Partial Phase II Bond <br />Release application SL -04. MCC is requesting a Partial Phase II Release for 67.6 acres. The amount <br />MCC is requesting for release for the Phase II areas for topsoil replacement and reestablishment of <br />vegetation will be determined following the application evaluation and site inspection. The Division will <br />review the Bond Release application and the applicable areas to determine if the Phase II Bond Release <br />criteria have been met. Based on the Divisions review, the Bond Release amount will be calculated and <br />the Bond Release acreages may be adjusted. <br />This revision is available for review at the Gunnison County Planning Department, 201 E. Virginia, <br />Gunnison, CO 81230. <br />If you have any questions, please contact me. <br />Office of <br />Mined Land Reclamation <br />James R. Stark <br />Environmental Protection Specialist <br />C CI 0 C1980007_JRS11282011020425.doc <br />STATE OF COLORADO <br />COLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />— &— <br />SAFETY <br />John W. Hickenlooper <br />Govemor <br />Mike King <br />Executive Director <br />Loretta E. Pileda <br />Director <br />Office of <br />Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.