Laserfiche WebLink
ame <br />ATTACHMENT A <br />2011 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF <br />Name <br />OCT 30 <br />OCT 31 <br />NOV 1 <br />NOV 2 <br />NOV 3 <br />NOV 4 <br />NOV 5 <br />Joseph Hickey <br />- <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />Craig Thompson <br />- <br />LS <br />LS <br />- <br />LS <br />LS <br />LS <br />Uwe Kelley <br />- <br />ST <br />ST <br />- <br />ST <br />ST <br />ST <br />Dustin Goto <br />- <br />GT <br />GT <br />- <br />GT <br />GT <br />GT <br />Szu -Min Yang <br />- <br />GT <br />GT <br />- <br />GT <br />GT <br />GT <br />Ben Melly <br />- <br />- <br />- <br />- <br />LG <br />LG <br />LG <br />Kevin Duarte <br />- <br />ST <br />ST <br />- <br />ST <br />ST <br />ST <br />Alyssa Wagner <br />- <br />LT <br />LT <br />- <br />LT <br />LT <br />LT <br />Jay Moore <br />- <br />- <br />- <br />- <br />PCE <br />- <br />- <br />Kim Morrison <br />- <br />- <br />- <br />- <br />PS <br />- <br />- <br />*Night Shift <br />LEGEND <br />Engineer <br />VLF Weekly Report WE 11.05.2011 <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field/Laboratory Manager <br />SE = Senior Engineer <br />