My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-23_REVISION - M1980244 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2011-11-23_REVISION - M1980244 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:20 PM
Creation date
11/29/2011 7:34:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/23/2011
Doc Name
Weekly VLF Earthworks Field Monitoring Report: 10/30/2011.
From
CC&V
To
DRMS
Type & Sequence
TR62
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />- <br />D <br />D <br />D <br />D <br />D <br />D <br />D = Day Shift N = Night Shift <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase IVC Berm Modification <br />Date: November 5, 2011 <br />Reporting Period: 10/30/11 through 11/5/11 <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I)Phase IVC Berm Modification <br />A) Drain Cover Fill <br />No work performed during the week. <br />CQA ACTIVITIES: <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Drain cover fill placement <br />Summary of Non - conformances: <br />None Issued <br />ame <br />Project No.: 84201125E0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Ambient Temperature Range (F): Low: 11°F to 30 ° F ( + / -) High: 28 °F to 51°F ( + / -) <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES/Lonestar: No work performed during the week due to snow accumulations on the geomembrane. <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution and Atterberg Limits testing) for sampled <br />materials. <br />PIVCBR Weekly Report WE 11.05.2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.