Laserfiche WebLink
Permittee Contact: <br />,Sc Sff P <br />Permittee Company: <br />S yhm i r Pze <br />13QLIC • T1Le - Co <br />Address: <br />pot. i3Lo Teo V0-0?-453 3 <br />_ _. - . - - — <br />Phone Number: <br />Fax Number: <br />`7 S`iZ -5 `/3 <br />Email Address: <br />Jae: t,+e SuMn `rckteekti <br />13. Attach a map to this report that accurately depicts the permit boundary, current affected area boundary and <br />location of the acreages specified in items 7- 12 and 14. Please check the appropriate response below: <br />UPDATED MAP ATTACHED: CONDITIONS UNCHAGED - PREVIOUS MAP ACCURATE: <br />14. Is weed control being conducted in accordance with an approved Weed Control Plan? $ NO N/A <br />If "YES ", indicate the weed species, control area, control type, application rate and treatment date on the <br />report map. pp , iuol, oog Fe -&o <br />M ,p c SI're <br />15. Is adequate topsoil reserved for reclamation, based on your approved permit? NO N/A <br />If "NO ", please explain: <br />16. Is the reserved topsoil vegetated /stabilized in accordance with Rule 3.1.9(1)? <br />If "NO" please explain: <br />17. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the <br />State Engineer (Well Permit, S.W.S.P., and /or Permarient Augmentation Plan)? YES NO c9 <br />18. Are all hazardous materials stored within approved spill containment structures? YES NO <br />/s ) 5T et:V as S iTC <br />19. Is your financial warranty value sufficient to cover the cost to complete reclamation? ' NO N/A <br />20. Is your basis for legal right to enter is still valid? <br />21. Does your permit require you to submit monitoring information annually? <br />If "Yes ", please attach the required monitoring results to this annual report. <br />Please provide current contact information: <br />i? (doze& Goo <br />Signature of Corporate Officer, Owner, or Documented Designee <br />YES <br />Dat <br />NO N/A <br />NO <br />I, the undersigned, hereby state that the information provided in this report is true and accurate, and that site <br />operations are being conducted in accordance with the Division approved mining and reclamation plans. <br />N/A <br />