Laserfiche WebLink
Structure or Item <br />Description <br />Dimensions <br />Demolition Menu <br />Selection <br />Quantity <br />Unit <br />i <br />Cost <br />Total Cost <br />NSI Plant <br />200'L x 175'W <br />x 50'H <br />Plant (3S) demo. /on -site <br />disposal in excavated pit <br />- Max. 200 ft. push <br />1,750,000.00 <br />CF <br />$0.19 <br />$337,750.00 <br />Product Storage <br />Dome <br />100'L x 100'W <br />x 50'H <br />Plant (3S) demo. /on -site <br />disposal in excavated pit <br />- Max. 200 ft. push <br />500,000.00 <br />CF <br />$0.19 <br />$96,500.00 <br />Removal of NSI Plant <br />Slab <br />200'L x 175'W <br />Demo. and on -site <br />disposal in excavated <br />pit, 8 in. thick - Max. <br />200 ft. push <br />35,000.00 <br />SF <br />$2.14 <br />$74,900.00 <br />Removal of Storage <br />Dome slab <br />100'L x 100'W <br />Demo. and on -site <br />disposal in existing pit, 8 <br />in. thick - Max. 200 ft. <br />push <br />10,000.00 <br />SF <br />$2.09 <br />$20,900.00 <br />Scale Building <br />20'W x 100'L x <br />15 <br />Plant (1S) demo. /on -site <br />disposal in excavated pit <br />- Max. 200 ft. push <br />30,000.00 <br />CF <br />$0.17 <br />$4,950.00 <br />Removal of Scale <br />Building Slab <br />20'W x 100'L <br />Demo. and on -site <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />2,000.00 <br />SF <br />$1.61 <br />$3,220.00 <br />Removal of Conveyor <br />System <br />200'L <br />Conveyor, elevated, <br />including supports - 5 ft. <br />W x 6 ft. H housing <br />200.00 <br />LF <br />$42.26 <br />$8,452.00 <br />Removal of Overhead <br />Powerline <br />2100'L <br />Powerline or utility line, <br />overhead, wood - <br />Double or "H" pole <br />2,100.00 <br />LF <br />$5.23 <br />$10,978.80 <br />Tank Farm <br />30'W x 50'H <br />Tank Removal and <br />disposal in pit <br />5.00 <br />Tank <br />$2,000.00 <br />$10,000.00 <br />Removal of Pipeline <br />3600' <br />Pipe, steel, welded <br />connections - 10 in. <br />diameter pipe <br />3,600.00 <br />LF <br />$13.95 <br />$50,233.32 <br />Task description: <br />Site: Nahcolite Project <br />PROJECT IDENTIFICATION <br />Task #: O 1 A <br />Date: 11/21/2011 <br />User: THM <br />UNIT COSTS <br />State: Colorado <br />County: Rio Blanco <br />Agency or organization name: DRMS <br />Job Hours: 0.00 <br />DEMOLITION WORK <br />Demo. of NSI Plant, Pipelines and Powerlines <br />Permit Action: SR -02 Permit/Job #: M1983194 <br />Subtotal <br />(unadjusted): $617,884.12 <br />Abbreviation: None <br />Filename: M194-01a <br />Location adjustment: 91.30 % <br />Total Cost <br />(adjusted for <br />location): <br />$564,128.20 <br />