Laserfiche WebLink
BULLDOZER RIPPING WORK <br />Task description: Rip 18.7 acres of road and compacted areas <br />Site: Nahcolite Project Permit Action: SR -02 Permit/Job #: M1983194 <br />PROJECT IDENTIFICATION <br />Task #: 09A State: Colorado Abbreviation: None <br />Date: 11/22/2011 County: Rio Blanco Filename: M194 -09a <br />User: THM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Area: <br />Basic Machine: Cat D8T - 8SU <br />Ripper Attachment: 3 -Shank Ripper <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Seismic Velocity: <br />Average Ripping Depth: <br />Average Ripping Width: <br />Average Ripping Length: <br />Average Dozer Speed: <br />Average Maneuver Time: <br />Production per unit area: <br />$65.28 <br />$102.81 <br />$6.49 <br />$38.49 <br />$213.07 <br />Total Fleet Cost/Hour: $426.14 <br />MATERIAL QUANTITIES Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA BCY NA <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Source of estimated quantity: Staff Estimate <br />HOURLY PRODUCTION <br />Seismic: <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Area: 19 acres Rip Depth (ft): 2.00 Volume: 60,339 BCY or CCY <br />NA feet/second <br />2.56 mph <br />7.08 degrees <br />300.00 feet <br />88.00 feet <br />0.25 feet <br />0.800 acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 0.800 Acres/hr <br />Site Altitude: 6,600 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Adjusted Hourly Unit Production: 0.66 Acres/hr <br />Adjusted Hourly Fleet Production: 1.33 Acres/hr <br />JOB TIME AND COST <br />Fleet size: 2 Ripper(s) Total job time: 14.09 Hours <br />Unit cost: $321.070 Per acre Total job cost: $6,004.00 <br />CIRCES Cost Estimating Software <br />