Laserfiche WebLink
C1981019 2 " quarter 2011 Fill Reports 2 July 14, 2011 <br />Both third and fourth quarter 2011 South Taylor Fill inspection reports are in compliance with Rule <br />4.09.1(11)(a) and (b). <br />West Pit Fill: <br />Inspection by a registered engineer, Mr. Thomas Peterson, for 2011 third quarter occurred on September 19, <br />2011. Mr. Peterson inspected the West Pit Fill on October 19, 2011 for the 2011 fourth quarter west pit fill <br />inspection. No new material was placed on the West Pit fill during third or fourth quarters 2011. Two <br />locations of water flow were noted in the report. The first was approximately 2 gallons per minute from the <br />toe of the West Pit underdrain. The second location recorded less than 2 gallons per minute near the toe of <br />the fill and its intersection with the West Pit pond road. No structural problems were identified in the third <br />or fourth quarter reports. <br />Both 2011 third quarter and fourth quarter West Pit Fill inspection reports are in compliance with Rule <br />4.09.1(11)(a) and (b). <br />Thank you for your timely submittal of the 2011 third and fourth Quarter West Pit Fill and South Taylor Fill <br />Reports. <br />Sincerely <br />anet H Binns <br />vironmen)al Protection Specialist II <br />(3 03 :66:1567 567 ext. 8107 <br />C: /jhb /Colowyo /Reports /2011 third & fourth quarter 2011 WP and ST Fill reports review.doc <br />