Laserfiche WebLink
Structure or Item <br />Description <br />Dimensions <br />Demolition Menu <br />Selection <br />Quantity <br />1.00 <br />Unit <br />each <br />Unit Cost <br />$69,892.47 <br />Total Cost <br />$69,892.47 <br />Mob /demob for <br />construction <br />N/A <br />USER PROVIDED <br />ITEM <br />Site preparation, <br />incl. <br />stormwater /eros. <br />control, demo., <br />clearing/grubb <br />N/A <br />USER PROVIDED <br />ITEM <br />1.00 <br />each <br />$92,473.12 <br />$92,473.12 <br />Construct upstream <br />cutoff wall, incl. <br />dewatering, low <br />water crossing <br />N/A <br />USER PROVIDED <br />ITEM <br />1.00 <br />each <br />$806,451.61 <br />$806,451.61 <br />Irrigation syst., <br />including power and <br />heat tracing <br />N/A <br />USER PROVIDED <br />ITEM <br />1.00 <br />each <br />$491,397.85 <br />$491,397.85 <br />Restoration <br />including habitat <br />mitigation, seed, <br />mulch <br />N/A <br />USER PROVIDED <br />ITEM <br />1.00 <br />each <br />$36,989.25 <br />$36,989.25 <br />Demolish upstream <br />cutoff wall <br />2ftTx220ftLX20ftH <br />Wall, concrete, <br />demolition only, <br />average reinforcing - <br />24 in. thick <br />8,800.00 <br />SF <br />$6.85 <br />$60,280.00 <br />Demolish footer of <br />upstream cutoff wall <br />lftX2ftX220ft <br />Footing, concrete, <br />average reinforcing - <br />1.O ft. x2ft. <br />220.00 <br />LF <br />$6.20 <br />$1,364.00 <br />Demolish pipeline <br />cradle foundations <br />10, each 5 ft long <br />Footing, concrete, <br />average reinforcing - <br />1.O ft. x2ft. <br />50.00 <br />LF <br />$6.20 <br />$310.00 <br />Cut 18" HDPE <br />pipeline into 30 -ft <br />lengths <br />3,000 ft, 100 cuts <br />USER PROVIDED <br />ITEM <br />100.00 <br />Cut <br />$25.00 <br />$2,500.00 <br />Load and haul <br />concrete and pipe to <br />landfill <br />341 cyds <br />Loading and 2 mile <br />haul, no salvage - <br />Machine loading <br />341.00 <br />CY <br />$15.10 <br />$5,149.10 <br />Landfill disposal fee <br />for concrete and <br />pipe <br />341 cyds <br />Dump fees - Building <br />construction materials. <br />341.00 <br />CY <br />$82.00 <br />$27,962.00 <br />Site: Schwartzwalder Mine <br />Task description: Low -flow diversion pipeline - Construction and demolition <br />PROJECT IDENTIFICATION <br />Task #: 18A <br />Date: 11/19/2011 <br />User: TAK <br />UNIT COSTS <br />State: Colorado <br />County: Jefferson <br />Agency or organization name: DRMS <br />Job Hours: 692.83 <br />DEMOLITION WORK <br />Permit Action: TR -18 Permit/Job #: M1977300 <br />Abbreviation: None <br />Filename: M300 -18a <br />Location adjustment: 93.00 % <br />Subtotal <br />(unadjusted): $1,594,769.40 <br />Total Cost <br />(adjusted for <br />location): $1,483,135.54 <br />