My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-22_PERMIT FILE - M2011054
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011054
>
2011-11-22_PERMIT FILE - M2011054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:16 PM
Creation date
11/22/2011 10:55:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011054
IBM Index Class Name
PERMIT FILE
Doc Date
11/22/2011
Doc Name
New 112c application
From
Oldcastle SW Group, Inc. dba United Companies
To
DRMS
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase <br />Mining (Years from <br />commencement of operations) <br />Active Reclamation <br />(Years from <br />commencement) <br />I <br />0 -5 <br />3 -8 <br />2 <br />5 -7 <br />8 -10 <br />3 <br />7 -10 <br />1 0-1 3 <br />Exhibit E — Reclamation Plan <br />Also refer to Exhibit F: Reclamation Plan Map. <br />Paul Banks and Associates, LLC <br />Overview <br />The post- mining use of the Debeque Gravel Permit Project will be rangeland, covering <br />the 45 acres of permitted area. Reclamation calls for stabilization and cover of disturbed <br />areas in accordance with standards that will accommodate the proposed post- mining <br />use. The permit area will be reclaimed using concurrent reclamation techniques. <br />Reclamation Process <br />Reclamation will consist of establishment of contours, re- spreading and any amendment <br />of plant growth medium, seeding and planting, and management prior to release. <br />The timetable for reclamation complements the phase mining plan, as noted below. In <br />general, concurrent reclamation will address final grading of mined slopes within 3 years <br />of the commencement of mining in any given area. <br />Topsoil Preservation <br />Topsoil stripped prior to mining will be stockpiled separately from overburden as specific <br />segments of screening berms around the permit boundary, or within the pit area, and will <br />be preserved by a temporary seed mix until ready for placement on the land surface for <br />reclamation. <br />Final Grading <br />Final proposed contours in mined areas are shown on the Reclamation Plan Map <br />(Exhibit F). In general, contours in mined areas will, conforming to Rule 3.1.5(7), <br />descend at 3H:1V from the top of slope to groundwater at approximately 5 feet and then <br />at 3:1 for an additional 10 feet below the groundwater level. Slopes of 2H:1V will be <br />Debeque Sand and Gravel Resource <br />Oldcastle Southwest Group, Inc. 11 <br />11019 <br />November 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.