Laserfiche WebLink
Exhibit 11 <br />Form No. OFFICE OF THE STATE ENGINEER <br />GWS -25 COLORADO DIVISION OF WATER RESOURCES <br />8:18 Centennial Bldg., 1313 Sherman St., Denver, Colorado 80203 <br />(303) 866 -3581 <br />WELL PERMIT NUMBER 286861 <br />APPLICANT I DIV. 2 WD 19 DES. BASIN MD <br />APPROVED WELL LOCATION <br />LAS ANIMAS COUNTY <br />NW 1/4 SW 114 Section 23 <br />NEW ELK COAL COMPANY Township 33 S Range 68 W Sixth P.M. <br />122 W FIRST ST DISTANCES FROM SECTION LINES <br />TRINIDAD, CO 81082- Ft. from Section Line <br />Ft. from Section Line <br />9) 845 -0090 UTM COORDINATES (Meters,Zone: 13. NAD83) <br />:).CONSTRUCT A WELL Easting: 602,356 Northing: 4112117 <br />ISSUANCE: OF THIS PERMIT DOES NOT CONFER,A WATER RIGHT <br />CONDITIONS OF APPROVAL <br />1) This well shall be used in such a way as to cause no material injury to existing water rights. The issuance of this permit does not ensure that <br />no injury will occur to another vested water right or preclude another owner of a vested water right from seeking relief in a civil court action. <br />2) The construction of this well shall be incompliance with the Water Well Construction Rules 2 CCR 402 -2, unless approval of a variance has <br />been granted by the State Board of Examiners of Water Well Construction and. Pump. Installation Contractors in accordance with Rule 18: <br />3) Approved pursuant to CRS 37 -92- 602(3) (b)(1) for uses as described in CRS 37- 92- 602(1)(f). Use of this well is limited to monitoring water levels <br />and /or water quality sampling. This. well is known as NE =S7.. <br />4) Issuance of this permit does not grant the applicant a license or permit forrinjection Into the aquifer since such, approval Is not underthe <br />jurisdiction of the Division of Water Resources. Injection is not approved herein and prior to use of this well for injection purposes, the <br />applicant shall obtain all_necessary approvals for injection required by authorizing state, federal, and local agencies. <br />5) This well must be equipped with a locking cap or seal to prevent well contamination or possible hazards as an open well. The well must be <br />kept capped and locked at all times except during sampling or measuring. <br />6) Records of water level measurements and water quality. analyses shall be maintained by the well owner and submitted to the Division of <br />Water Resources upon request. <br />7) Upon conclusion of the monitoring program the well owner shall plug this well in accordance with Rule 16 of the Water Well Construction <br />Rules. A Well Abandonment Report must be completed and submitted to the Division of Water Resources within 60 days of plugging. <br />8) The owner shall mark the well in a conspicuous place with the well permit number and name of aquifer as appropriate, and shall take <br />necessary means and precautions to preserve these markings.. <br />9)' This well must be constructed by or under the supervision of a licensed well driller or other authorized individual according to the Water Well <br />Construction Rules. If non-standard construction is anticipated,. a variance request must be submitted in accordance with Rule 18 and approved <br />prior to well construction. <br />10) A Well Construction and Test; Report (Form GWS -31), including lithologic log must be submitted by the individual authorized to construct the <br />well: For non - standard construction,_the:report must include an as -built drawing: showing details such as depth, casing, perforated zones, and a <br />description of the grouting type and interval. <br />11) Pursuant to Rule 6.2.3 of the Water Well Construction Rules, the well construction contractor shall submit (he as -built well location on -work <br />reports required by Rule 17.3 within 66.days of completion of the well. The measured location must be accurate to 200 feet of the actual <br />location. The location information. must include a GPS location (UTM coordinates) pursuant to the.Division of Water Resources' guidelines. <br />NOTE: The approved well location,, above, is for internal mapping purposes only and is not meant to constrain the location of the well. The <br />well may be located anywhere on the 10.29 t/- acre tract of land as designated on the attached exhibit A. <br />NOTE:. issuance of this permit does not guarantee that this well can be converted to a production well under future permit. Additionally, <br />pursuant to Rule 14.2 of the Water Well Construction Rules (2 CCR 402 -2), monitoring holes constructed pursuant to a monitoring hole notice <br />shall not be converted to a production well. (Upon obtaining a permit from the State Engineer, a monitoring hole may be converted to a <br />monitoring well, recovery well.for remediation of the aquifer, or a dewatering system for dewatering the aquifer.) <br />NOTE: This permit will expire on the expiration date unless the well is constructed by that date. A Well Construction and Test Report <br />(GWS 731) must be submitted to the Division of Water Resources to verify the well has been constructed. An extension of the expiration date <br />may be available. Contact the DWR for additional information or refer to the extension request form (GWS -64) available at- <br />http. /Avww.viater;state_co.us <br />APPROVED <br />CRF <br />State Engineer 0 By <br />DATE ISSUED 10-18-2011 EXPIRATIO DATE 10 -18 -2013 <br />