My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-21_PERMIT FILE - X201123201 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X201123201
>
2011-11-21_PERMIT FILE - X201123201 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:13 PM
Creation date
11/21/2011 8:29:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201123201
IBM Index Class Name
PERMIT FILE
Doc Date
11/21/2011
Doc Name
180 Day Report
From
J.E. Stover & Associates, Inc
To
DRMS
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />COAL EXPLORATION 180 -DAY REPORT <br />N N 1 2011 <br />,�e clamatic <br />ty <br />Mining an d Safe <br />Prospector: New Elk Coal Company, LLC Notice of Intent No.: NOI -X- 2011 - 232 -00 <br />Address: 122 West First Street Project Name: 2011 Exploration <br />Trinidad, CO 81082 County: Las Animas <br />Date: November 16, 2011 <br />This report is filed in accordance with Rule 2.02.6(3)(a) of the Regulations of the Colorado <br />Mined Land Reclamation Board for Coal Mining, adopted in accordance with the Colorado <br />Surface Coal Mining Act, C.R.S. 34 -33 -101 et seq. The purpose of this report is to update <br />the Division on exploration and reclamation activities that have occurred in the past 180 days <br />of active prospecting. The report also indicates any changes in operations from what was <br />stated in the original Notice of Intent sent to the Division. The Operator may use this form, <br />modify this form, or use a different format altogether. <br />1. Attach a map that shows: <br />a) Which proposed holes have been drilled at the date, <br />b) Any actual or proposed relocations of holes, <br />c) The extent of all significant road construction completed to date (exclude <br />minor blade work), and <br />d) Current location of all drill rigs and test equipment. <br />2. Describe what and where reclamation activities have occurred in the past 180 <br />days. Mention sealing and plugging, regrading, retopsoiling and reseeding <br />activities. (Attach additional pages, if needed.) <br />All of the drill sites have been regraded, retopsoiled and seeded. All holes drilled except <br />monitoring wells NE -05 -11 and NE -08 -11 have been sealed. All drill holes that have been sealed <br />were filled with cement. Drill holes NE- 01 -11, NE- 02 -11, NE- 03 -11, NE- 04 -11, NE- 07 -11, <br />NE- 09 -11, NE- 11 -11, NE- 12 -11, NE- 13 -11, NE14 -11, NE -15 -11 and NE -16 -11 were sealed. Drill <br />rigs and test equipment have been demobilized. <br />
The URL can be used to link to this page
Your browser does not support the video tag.