Laserfiche WebLink
November 16, 2011 C- 1992- 081/Hayden Gulch Loadout JDM <br />OTHER (SPECIFY): <br />This was a partial coal inspection of the Hayden Gulch Loadout conducted by Jason Musick of CDRMS and Jared <br />Ebert of CDRMS. The loadout site was dry and the weather was clear at the time of the inspection. Reclamation <br />activities continue at the site. <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 4 <br />