Laserfiche WebLink
AMEC observed the realignment of the Phase IV perimeter road. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture- Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL P OJECT ITEMS <br />Summary of Co cerns: <br />No concerns <br />Summary of Planning Items: <br />Drain cover fill placement <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V :: <br />CC &V held a weekly construction meeting on October 25, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />None <br />AMEC: <br />None <br />Summary of Incidents /Accidents/Health & Safety Issues: <br />None <br />We trust the information provided clearly represen <br />October 29, 2011. <br />Joseph Hickey, CQA Monito <br />Approved By: <br />ur findings and observations for the week ending <br />Date: October 29, 2011 <br />Date: 5' //d ‘, /1 <br />PIVCBR Weekly Report WE 10.29.2011 <br />