My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-17_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2011-11-17_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:07 PM
Creation date
11/18/2011 7:07:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/17/2011
Doc Name
Weekly VLF Earthworks Field Monitoring Reports: Weeks of 10/16/2011 & 10/23/2011.
From
CC&V
To
DRMS
Type & Sequence
TR62
Email Name
TC1
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />- <br />D <br />D <br />- <br />ID <br />- <br />D <br />D = Day Shift N = Night Shift <br />VLF EA I'' THWORKS FIELD MONITORING SUMMARY (WEEKLY REPO I "T <br />Project Title: CC &V/ Phase 5 <br />Ow er: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase IVC Berm Modification <br />October 29, 2011 <br />Reporting Period: 10/23/11 through 10/29/11 <br />Project No.: 84201125E0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Ambient Temperature Range (F): Low: 13 °F to 35 °F ( + / -) High: 28 °F to 57 °F ( + / -) <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES/Lonestar: None <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I)Phase IVC Berm Modification <br />A) Soil Liner Fill <br />1) Berm Modification <br />Soil liner fill (SLF) placement was completed using a CAT 950 front -end loader and a John <br />Deere 35D excavator. Compaction was achieved using a vibratory plate compactor and <br />laborers. The berm was constructed in accordance with design drawings and project <br />specifications. <br />e c, <br />B) Geomembrane <br />1) Geomembrane Installation <br />Geomembrane deployment, seaming, and repair /QC activities were performed. Approximately <br />6,071 square feet of 80mil LLDPE was deployed using a Komatsu 200 excavator and a John <br />Deere 544 front -end loader with spreader -bar attachments. Subgrade was inspected and <br />approved by AMEC and Lonestar representatives prior to geomembrane deployment. <br />Approximately 63 linear feet of seam was fusion welded using one fusion welding <br />machine /welding technician combination. One destructive test sample was marked during <br />fusion seaming. Approximately 374 linear feet of seam was extrusion welded using one <br />extrusion welding machine /welding technician combination. One destructive test sample was <br />marked during extrusion seaming. All destructive tests performed were within project <br />specifications. Non - destructive testing was performed for fusion welded seams. Repairs were <br />PIVCBR Weekly Report WE 10.29.2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.