Laserfiche WebLink
Month <br />Aggregate <br />Production <br />(tons) <br />(A) <br />Water I <br />Re <br />in Product <br />(ac ft) <br />(B) <br />Water Used I <br />For Dust <br />Control <br />(ac ft) <br />(C) I <br />Concrete I <br />o . - rinn <br />(ac ft) <br />(D) <br />Operational I <br />Consumptive <br />Use <br />(ac-ft) <br />(E) I <br />Evaporative <br />Consumptive <br />Use <br />(ac ft) <br />(F) <br />Total <br />Howe Pit <br />Consumptive Use <br />(ac -ft) <br />(G) <br />Total I <br />Lagged <br />Depletions <br />(ac -ft) <br />(H) <br />Nov -11 <br />0 <br />0 <br />0.00 <br />0.59 <br />0.59 <br />0.00 <br />0.59 <br />0.38 <br />Dec -11 <br />0 <br />0 <br />0.00 <br />0.20 <br />0.20 <br />0.00 <br />• <br />0.20 <br />0.42 <br />Jan -12 <br />0 <br />0 <br />0.00 <br />2.10 <br />2.10 <br />P ' <br />2.10 <br />0.46 <br />Feb-12 <br />0 <br />0 <br />0.00 <br />2.10 <br />2.10 <br />2.10 <br />0.68 <br />Mar -12 1 <br />0 <br />0 <br />0.00 <br />2.10 <br />2.10 <br />-t., <br />c <br />2.10 <br />0.88 <br />' Apr -12 <br />0 <br />0 <br />0.00 <br />2.63 <br />2.63 <br />m <br />- <br />2.63 <br />1.04 <br />May -12 <br />0 <br />0 <br />0.00 <br />2.63 <br />2.63 <br />. ;,9.... <br />2.63 <br />1.21 <br />Jun-12 <br />0 <br />0 <br />0.00 <br />2.63 <br />2.63 <br />� c <br />� Qd F <br />2.63 <br />1.35 <br />'Jul -12 <br />0 <br />0 <br />0.00 <br />2.63 <br />2.63 <br />a� o° , <br />2.63 <br />1.46 <br />Aug -12 <br />0 <br />0 <br />0.00 <br />2.63 <br />2.63 <br />0 �& o` J <br />2.63 <br />1.55 <br />Sep-12 <br />0 <br />0 <br />0.00 <br />2.63 <br />2.63 <br />JO <br />2.63 <br />1.63 <br />Oct -12 <br />0 <br />0 <br />0.00 <br />2.10 <br />2.10 <br />0.00 <br />2.10 <br />1.68 <br />Total <br />0 <br />0.0 <br />0.0 <br />25.0 <br />25.0 <br />0.0 <br />25.0 <br />12.7 <br />Appendix A <br />Lafarge West, Inc. <br />Howe Pit <br />Substitute Water Supply Plan - Evaporative Losses <br />Total Material Mined = <br />Water Pumped for Concrete= <br />Moisture Content = <br />Dust Control = <br />Denver Water is responsible for the. Evaporative Losses at the Howe Pit in Water Year 2012 <br />Substitute Water Supply Plan - Operational Losses <br />0 <br />25.0 <br />4.0% <br />0.0 <br />tons <br />ac -ft <br />ac -ft <br />Notes: <br />(A) Total material mined <br />(8) Water retained in product calculated as 4% of aggregate production <br />(C) Water used for dust control <br />(D) Water use for approx. 85,000 cubic yards of concrete production <br />(E) Operationalconsumlitive use = (B) + (C) + (D) <br />(F) Total lake evaporation from exposed water surfaces requiring augmentation by Lafarge <br />(G) Column (E) + Column (F) <br />(H) Total lagged mining depletions which reflect existing real time conditions at the Howe Pit Site <br />N:110100 Lafarge SWSP,ISWSPSISoub Wale CombinedaNY 2012 Estimated Combined Renewal Gish <br />- plegate <br />'roue. Ine. <br />