Laserfiche WebLink
I.AFARG E <br />AGGREGATES <br />& CONCRETE <br />November 10, 2011 SENT VIA CERTIFIED MAIL 7007 2680 0001 0953 9995 <br />Mr. Michael Cunningham <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: M -1974 -015, Lyons, Temporary Cessation request <br />Dear Mr. Cunningham, <br />Please accept this request for a Temporary Cessation at the Lafarge Lyons Pit, M- 1974 -015. The <br />following has /is occurring on site in compliance with Construction Materials Rule 1, Section 1.13.2, <br />"Indications of Temporary Cessation." <br />1.13 .2(1) <br />1.13.2(2) <br />1.13 .2(3) <br />1.13 .2(4) <br />1.13.2(5) <br />1.13.2(6) <br />1.13.2(7) <br />Construction Materials Rule 1, Section 1.13.5 provides requirements the Operator is to provide as <br />notification for the Temporary Cessation request. The following statements satisfy these requirements. <br />Date of Cessation: <br />Cessation Reasoning: <br />Resumption Plan: <br />LAFARGE WEST, INC. <br />101070 Church Ranch Way, Suite 200 <br />Westminster, CO 80021 <br />(303) 657 -4000 Main Line (303) 657 -4037 Fax <br />‘4o\1 " 4 7.011 <br />Division of ReCam�o, <br />�� dining and Safely <br />There are no personnel working at the site for 180 consecutive days. <br />There are only security personnel at the site. <br />There are personnel other than security people at the site, but they are engaged <br />in activities which can be described as maintenance or housekeeping, or related <br />activity. <br />There are personnel at the site, but they are engaged in activities which are not <br />significantly moving the site towards completion of the mining operation. <br />There is no sale or processing of material or movement of stockpiled material. <br />There is only minimal or token excavation of construction material or other <br />materials. <br />Mine development has ceased and mining has not recommenced. <br />The last records Lafarge has indicating when mining activity occurred on <br />site are from 2006. Demolition of structures within the mine permit <br />boundary has occurred since 2006 to clear the surface in preparation of <br />mining. Removal of sand and gravel stockpiled on site has occurred <br />since 2006 but active mining has not. <br />The market has not supported opening the pit at this time. Lafarge is in <br />the process of final Reclamation of an adjacent pit, the Miller Pit. <br />Lafarge has been actively pursuing reclamation in the vicinity but not <br />mining. <br />Placing the reserve in "idle" status for a period of five years will secure <br />the reserve for a better economy. <br />