My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-10_REPORT - M1977326
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977326
>
2011-11-10_REPORT - M1977326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:52:31 PM
Creation date
11/15/2011 2:08:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977326
IBM Index Class Name
REPORT
Doc Date
11/10/2011
From
General Shale Brick
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permittee Contact: <br />c � / C- o b is; zi <br />Permittee Company: <br />Address: <br />- - <br />I g i-f5 v4 . (J oys'- hmotA+ <br />_) Cnvq,c; (-a g©►10 <br />-, R ye.. <br />Phone Number: <br />( o ) 183 3(31A--t 1 <br />Fax Number: <br />(33) `•7 33 -D,wCI a <br />Email Address: <br />cc II cin_ne-r-rAkku II <br />13. Attach a map to this report that accurately depicts the permit boundary, current affected area boundary and <br />location of the acreages specified in items 7- 12 and 14. Please check the appropriate response below: <br />UPDATED MAP ATTACHED: CONDITIONS UNCHAGED - PREVIOUS MAP ACCURATE: A <br />14. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO N/A <br />If "YES ", indicate the weed species, control area, control type, application rate and treatment date on the <br />report map. <br />15. Is adequate topsoil reserved for reclamation, based on your approved permit? <br />If "NO ", please explain: <br />16. Is the reserved topsoil vegetated /stabilized in accordance with Rule 3.1.9(1)? <br />If "NO" please explain: <br />or orate Of <br />wner, or i ocumented Designee <br />Si nature of <br />17. If mining has exposed groundwater, is the site in compliance with the approved mining .lan and Office o <br />State Engineer (Well Permit, S.W.S.P., and /or Permanent Augmentation Plan)? YES NO <br />18. Are all hazardous materials stored within approved spill containment structures? YES NO <br />19. Is your financial warranty value sufficient to cover the cost to complete reclamation? NO N/A <br />20. Is your basis for legal right to enter is still valid? NO <br />21. Does your permit require you to submit monitoring information annually? YES NO N/A <br />If "Yes ", please attach the required monitoring results to this annual report. <br />Please provide current contact information: <br />I, the undersigned, hereby state that the information provided in this report is true and accurate, and that site <br />ope ations are being conduc d in accordance with the Division approved mining and reclamation plans. <br />)1 a3 Z l ) <br />Date <br />NO N/A <br />NO N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.