Laserfiche WebLink
• <br />15.0 Construction Quality Assurance Quality Control <br />Plan <br />No new EPFs are planned to be constructed at the Sunday Mines Group. Therefore, <br />quality assurance and quality control plans related to EPFs are not applicable to this <br />EPP. Information regarding construction of other facilities at the Sunday Mines Group <br />has been submitted to the Division previously, and is incorporated into this document <br />by reference. <br />C: \Documents ant Settinos\cwoodward.DMC \Desktop \Environmental Protection Plan Sunday Mines Revised November 2011 rev1 (2)11 10 11.docx <br />15 -1 <br />