Laserfiche WebLink
PR -06 Adequacy Responses <br />Page 4 <br />• Tab 13 <br />19. Pages 16 and 17 should be revised to remove the discussion of the stream buffer zone associated <br />with the TAHR. <br />Response: An instance like the above was exactly the reason for including a NOTICE TO REVIEWERS <br />to insert at the beginning of each tab. However, since it has caused significant concern for the Division, <br />the pages have been revised. <br />20. SCC proposes removal of page 21, but does not account for page 22 that is on the back of currently <br />approved page 21. Please resubmit an "intentionally blank" page 21 with page 22 on the back side. <br />Response: New pages are attached. <br />21. SCC proposes removal of page 25, but does not account for page 26 that is on the back of currently <br />approved page 21. Please resubmit an "intentionally blank" page 25 with page 26 on the back side. <br />Response: New pages are attached. <br />22. Page 30 references the Coal Carrier Access Road as a permanent feature, and refers the reader to <br />Exhibit 13.11 -7, which will be removed with the proposed revision. Page 36 also includes a reference <br />to this road. Please revise pages 30 and 36 to delete the references to the coal carrier access road. <br />If permanent retention of this road is desirable, it should be addressed with the pending Hayden <br />Gulch Loadout permit revision. <br />Response: Again, an instance like the above was exactly the reason for including a NOTICE TO <br />REVIEWERS to insert at the beginning of each tab. However, since it has caused significant concern for <br />the Division, the pages have been revised. <br />23. Attachment 13 -8 includes design information for the sumps at the TAHR topsoil stockpiles. The <br />designs associated with the TAHR should be removed. <br />Response: Again, an instance like the above was exactly the reason for including a NOTICE TO <br />REVIEWERS to insert at the beginning of each tab. However, since it has caused significant concern for <br />the Division, the pages have been revised. <br />24. Attachment 13 -10 includes the TAHR construction summary; it should be removed. <br />Response: This attachment was listed in the initial insertion instructions for removal. However, we will <br />list it in the Insertion Instructions again. <br />Seneca Coal Company • P.O. Box 670 • Hayden, Colorado 81639 <br />Telephone (970) 276 -5217 • FAX (970) 276 -5222 <br />