Laserfiche WebLink
Cycle Time Factors <br />Length <br />(feet) <br />Factor (min.) <br />Source <br />Material : <br />Material 3/4" to 6" diameter <br />0.000 <br />(Cat HB) <br />Stockpile : <br />No adjustment - factor not applicable <br />0.000 <br />(Cat HB) <br />Truck ownership : <br />No adjustment - factor not applicable <br />0.000 <br />(Cat HB) <br />Operation : <br />Inconsistent operation <br />0.040 <br />(Cat HB) <br />Dump target : <br />Fragile target <br />0.050 <br />(Cat HB) <br />Haul and Return Time <br />Length <br />(feet) <br />Grade res. <br />( %) <br />Rolling res. <br />( %) <br />Total res. <br />( %) <br />Travel time <br />(minutes) <br />Data <br />Source <br />Haul route : <br />NA -user <br />NA -user <br />NA -user <br />NA -user <br />0.1500 <br />(user) <br />Retum route : <br />100 <br />0.00 <br />8.00 <br />8.00 <br />0.0951 <br />(Cat HB) <br />PROJECT IDENTIFICATION <br />Task # : 003 State : Colorado Permit/job # : P -2011 -030 <br />Date : 11/07/2011 County : Ouray Abbreviation : none <br />User : RCO Site : Revenue Mine Exploration Filename : P030 -003 <br />Agency or organization name :DRMS <br />Permit or other job action : New NO/ <br />Task description : Carry and spread waste rock on dump <br />HOURLY EQUIPMENT COST Basic machine : CAT 906 Horsepower : 60 <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Data source : (CRG) <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 2,866 <br />HOURLY PRODUCTION <br />Loader Cycle Time <br />LCY <br />Source of quantity take -off :4300 tons, per plan <br />Source of estimated swell factor : NA <br />Job Condition Correction Factors <br />Site altitude : 10,650 feet <br />CIRCES Cost Estimating Software <br />WHEEL LOADER - LOAD AND CARRY WORK <br />Ownership cost/hour : $8.81 <br />Operating cost/hour : $13.17 <br />Operator cost/hour: $38.54 <br />Total unit cost/hour : $60.51 <br />Utilization % <br />NA <br />NA <br />Unadjusted hourly unit production : 70.21 LCY /Hr <br />Adjusted hourly unit production : 35.55 LCY /Hr <br />Adjusted hourly fleet production : 35.55 LCY /Hr <br />100 <br />Swell Final <br />factor : NA volume : 2,866 LCY <br />(Cat HB) <br />Unadjusted basic cycle time (load, dump, maneuver) : 0.450 minutes <br />Net cycle time adjustment : <br />Adjusted basic cycle time : <br />Rolling Resistance - Road Conditions <br />Haul : Rutted dirt, little maintenance, no water, 1" tire penetration <br />Retum : Soft, rutted dirt, no maintenance or water, 4" tire penetration <br />Total fleet cost/hour : $60.51 <br />0.090 <br />minutes <br />0.540 minutes <br />Total travel time : <br />Total cycle time : <br />1.05 LCY (heaped) (Cat HB) <br />Loader Bucket Capacity <br />Rated capacity : <br />Bucket fill factor : 0.875 Loose material - 1 " and over (85 - 90%) <br />Adjusted capacity : 0.92 LCY <br />(program) <br />0.2451 <br />minutes <br />0.785 minutes <br />Source <br />Altitude adjustment factor : 0.61 I (Cat HB) <br />Job efficiency factor : 0.83 I (1 shift/day) <br />Net correction : 0.51 multiplier <br />JOB TIME AND COST <br />Fleet size : 1 Loader(s) Total job time : 80.62 Hours <br />Unit cost : $1.702 /LCY Total job cost : $4,878 <br />