My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-09_REVISION - P2009033
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2009033
>
2011-11-09_REVISION - P2009033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 12:14:15 PM
Creation date
11/14/2011 3:04:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009033
IBM Index Class Name
REVISION
Doc Date
11/9/2011
Doc Name
Release request (SL-01)
From
Colorado Plateau Partners LLC
To
DRMS
Type & Sequence
SL1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />Complete One (1) of Either Subsections A or B; and Subsection C. <br />A. PERMANENT ABANDONMENT (Check the appropriate box and provide information) <br />[Plugged dry hole, method of plugging: <br />Holes backfilled with cuttings to 7' below surface, 5' concrete plug poured on top <br />Depth at which concrete plug set: 2 feet below ground surface. <br />❑Sealed Hole: <br />[Neat Cement Grout, top to bottom: grout mixture used: <br />D Neat Cement Grout, interval grouting: grout mixture used: <br />Intervals grouted (feet beneath ground surface, method and materials): <br />[1 Abandonment Fluid Mixture (Such as Sodium Bentonite with Polymer) Brand Name: <br />Marsh Funnel viscosity of abandonment fluid: sec. <br />Type of surface plugging used: <br />Depth at which plug set: feet below ground surface, <br />Method: <br />il lther method used with approval of the Division of Reclamation, Mining and Safety; describe in <br />detail method and materials used on a separate attached sheet; <br />B. CONVERSION TO A WATER WELL <br />State Engineer's Permit No.: (attach copy of permit) <br />County Where Well is Located: <br />Water Well Use: <br />C. METHOD OF RECLAIMING DRILL SITE DISTURBANCE: <br />Cuttings pit backfilled, covered with topsoil and seeded. All equipment and unnatural <br />debris removed, entire area seeded and logs /brush strewn about area <br />The Operator who conducted the prospecting drill operation states that the information set forth hereupon is true to the <br />best of their knowledge. <br />Name of Operator's Representative: <br />Signature of Operator's Representative: <br />rnin°share'Prospecting FormslllH Abandonment Final Rpt.doc <br />Title: <br />Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.