Laserfiche WebLink
By letters dated March 7, 2008, Denison notified the Division under Rule 7.2.3(1) of the Colorado Mineral <br />Rules and Regulations for Hard Rock, Metal and Designated Mining Operations, that it was not challenging <br />these determinations, but that it would proceed to prepare EPPs for each of these mines in accordance with Rule <br />7.2.3(2). In those letters, Denison also advised the Division that it believed that in the course of preparing such <br />EPPs it may be able to demonstrate that some or all of the mines should be considered to be exempt from the <br />EPP requirements under Rule 1.1(14)(e) or Rule 7.2.6(1). <br />Two of these mines, the Carnation and St. Jude are currently permitted as limited impact operations (110 <br />permits), while the remaining three, the Sunday, Topaz and West Sunday, are currently permitted as Regular <br />Operations (112 permits). As the Division has indicated that the DMO Rules could be applied differently to <br />110 permits relative to 112 permits, we address each type of permit separately. <br />If you have any questions or comments regarding this EPP, please feel free to call me at 303 -389- <br />4136. <br />Yours very truly, <br />DENISON MINES (USA) CORP. <br />Christy Woodward, PE <br />Environmental Coordinator <br />Cc: Bob Oswald, Division of Reclamation, Mining and Safety <br />Enclosure <br />A <br />MINES <br />