Laserfiche WebLink
October 24, 2011 <br />Dear Mr. Kaldenbach: <br />i x Greg Lewicki And Associates, PLLC <br />11541 Warrington Court Phone: (303) 346 -5196 Fax (303 )-346 -6934 <br />Parker, CO USA 80138 E -Mail: info@lewicki.biz <br />Tom Kaldenbach <br />Colorado Division of Reclamation, Mining, and Safety <br />1313 Sherman Street, Rm 215 <br />Denver, CO 80203 <br />The amount of material to be extracted is 2,000 tons. <br />It is the anticipated average depth of each hole. <br />C r: c EMT <br />RE: Notice of Intent to Conduct Prospecting Operations (NOI) No. P- 20 11 -029; <br />London Butte Underground Exploration; Notice of Deficiencies <br />4- <br />1. PROJECT DESCRIPTION, Item 11L2. Under "Amount of material to be extracted, <br />moved, or proposed to be moved" the applicant states "2,000.00." Please indicate the <br />units (pounds, tons, etc.) and where it will be disposed after extraction. <br />RECEIVED <br />`'NOV 092011 <br />Division of Reclamation, <br />rIJ' Mining & Safety <br />On October 18, 2011, Alma Placer Company received a review of the NOI application for <br />London Butte Underground Exploration (P -2011 -029) from the DRMS. Below are Alma Placer's <br />responses to each item of deficiency the Division identified. <br />2. PROJECT DESCRIPTION, Item II1.5. The applicant states that an existing shaft will be <br />rehabilitated to provide a secondary escapeway and ventilation circuit. Is this the shaft <br />that is labeled as "London Butte Shaft" on Figures 2 and 3? <br />Yes, the London Butte Shaft will be rehabilitated to provide a secondary escapeway and for <br />ventilation. <br />3. PROJECT DESCRIPTION, Item IIL6.B. The depth of drill holes is indicated as 600 feet. <br />Is this a cumulative depth for all holes or the anticipated depth for each hole? <br />4. PROJECT DESCRIPTION, Item III.6.C. Please provide an estimate of how deep into the <br />adit and at what levels the rehabilitation activities will occur. Please indicate if any new <br />underground excavation will occur. <br />Rehabilitation will take place roughly 1500' into adit. No new underground excavation will <br />take place at this time. <br />