Laserfiche WebLink
Task description: <br />Site: Lyster Pit <br />PROJECT IDENTIFICATION <br />Task #: 02A . State: Colorado Abbreviation: None <br />Date: 11/2/2011 County: Moffat Filename: M009 -02a <br />User: DMC <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9U <br />Horsepower: 405 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Agency or organization name: DRMS <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $251.56 <br />Total Fleet Cost/Hour: $251.56 <br />MATERIAL QUANTITIES <br />Initial Volume: 18,731 <br />Swell factor: 1.230 <br />Loose volume: 23,039 LCY <br />$72.40 <br />$140.68 <br />$0.00 <br />$38.49 <br />Source of estimated volume: 3,500 ft. (pond perimeter) x 144.5 sqft. <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production: 2,222.9 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />15% <br />6,200 feet <br />Material weight: 2,100 lbs/LCY <br />Weight description: Earth - Loam <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />0.750 <br />1.200 <br />1.000 <br />BULLDOZER WORK <br />Establish 3H:1V grade around perimeter of pond <br />Permit Action: TR2 Permit/Job #: M2008009 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />Page 1 of 2 <br />CIRCES Cost Estimating Software <br />