Laserfiche WebLink
Task description: Replace topsoil over 5.8 acre Test Pad and access roads <br />AMSO RD &D Project -Phase Permit Action: <br />Site: 1 <br />PROJECT IDENTIFICATION <br />Task #: 09A State: Colorado <br />Date: 11/4/2011 County: Rio Blanco <br />User: THM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D7R DS Series II LGP <br />Horsepower: 238 <br />Blade Type: Straight <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $165.04 <br />Total Fleet Cost/Hour: $165.04 <br />MATERIAL QUANTITIES <br />Initial Volume: 7,018 <br />Swell factor: 1.000 <br />Loose volume: 7,018 LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />$46.30 <br />$80.25 <br />$0.00 <br />$38.49 <br />BULLDOZER WORK <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 150 feet <br />Unadjusted hourly production: 369.6 LCY /hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: -5 % <br />Average site altitude: 6,900 feet <br />Material weight: 1,6001bs/LCY <br />0.750 <br />1.200 <br />MD -06 Permit/Job #: P2008046 <br />Source <br />(AVG.) <br />(CAT HB) <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: PO46 -09a <br />CIRCES Cost Estimating Software <br />