Laserfiche WebLink
BULLDOZER RIPPING WORK <br />Task description: Rip 1.4 acres of access road <br />AMSO RD &D Project -Phase Permit Action: <br />Site: 1 <br />PROJECT IDENTIFICATION <br />Task #: 08A State: Colorado <br />Date: 11/4/2011 County: Rio Blanco <br />User: THM <br />Agency or organization name' DRMS <br />HOURLY EQUIPMENT COST <br />Area: <br />Cost Breakdown: <br />Basic Machine: Cat D7R DS Series II LGP <br />Ripper Attachment: 3 -Shank Ripper <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Seismic Velocity: <br />Average Ripping Depth: <br />Average Ripping Width: <br />Average Ripping Length: <br />Average Dozer Speed: <br />Average Maneuver Time: <br />Production per unit area: <br />Unit cost: $307.901 Per acre <br />$46.30 <br />$80.25 <br />$0.00 <br />$38.49 <br />$165.04 <br />Source of estimated quantity: Proposed Road Conditions <br />HOURLY PRODUCTION <br />Seismic: <br />MD -06 Permit/Job #: P2008046 <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />NA feet/second <br />2.45 mph <br />6.50 degrees <br />100.00 feet <br />88.00 feet <br />0.25 feet <br />0.646 acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 0.646 Acres/hr <br />Site Altitude: 6,900 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Adjusted Hourly Unit Production: 0.54 Acres/hr <br />Adjusted Hourly Fleet Production: 0.54 Acres/hr <br />Total job cost: $431.00 <br />Abbreviation: None <br />Filename: PO46 -08a <br />Horsepower: 238 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Total Fleet Cost/Hour: $165.04 <br />MATERIAL QUANTITIES Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA BCY NA <br />Area: 1 acres Rip Depth (ft): 2.00 Volume: 4,517 BCY or CCY <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 2.61 Hours <br />CIRCES Cost Estimating Software <br />