Laserfiche WebLink
Loader Worksheet Cont'd <br />1.00 <br />0.83 <br />0.83 <br />Load Bucket Capacity <br />Rated Capacity: 1.50 LCY (heaped) <br />Bucket Fill Factor: 0.900 Other - soil, boulders, roots (80 -100 %) 0.900 <br />Adjusted Capacity: 1.35 LCY <br />Job Condition Correction Factors <br />Site Altitude: 7500 feet <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />Task # 02A Page 2 of 2 <br />Source <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />Total Travel Time: 0.0353 minutes <br />Total Cycle Time: 0.6103 minutes <br />Unadjusted Hourly Unit Production: 132.73 LCY/Hour <br />Adjusted Hourly Unit Production: 110.16 LCY/Hour <br />Adjusted Hourly Fleet Production: 110.16 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 2.27 Hours <br />Unit cost: $0.802 /LCY Total job cost: $201.00 <br />CIRCES Cost Estimating Software <br />