Laserfiche WebLink
E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): <br />❑ Office (Desk) Determination. Date: <br />® Field Determination. Date(s): Oct 18, 2011 <br />F. SUPPORTING DATA: <br />Data reviewed for preliminary JD (check all that apply - checked items should be included in <br />case file and, where checked and requested, appropriately reference sources below): <br />® Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: Jacobs <br />Engineering Group. <br />❑ Data sheets prepared /submitted by or on behalf of the app_ licant /consultant. <br />❑ Office concurs with data sheets /delineation report. <br />❑ Office does not concur with data sheets /delineation report. <br />❑ Data sheets prepared by the Corps: <br />❑ Corps navigable waters' study: <br />❑ U.S. Geological Survey Hydrologic Atlas: <br />❑ USGS NHD data. <br />❑ USGS 8 and 12 digit HUC maps. <br />❑ U.S. Geological Survey map(s). Cite quad name: <br />❑ USDA Natural Resources Conservation Service Soil Survey. Citation: GIS. <br />❑ National wetlands inventory map(s). Cite name: GIS. <br />❑ State /Local wetland inventory map(s): <br />❑ FEMA /FIRM maps: <br />❑ 100 -year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929) <br />® Photographs: ® Aerial (Name & Date):Oct 2010 Google Earth Image. <br />or ❑ Other (Name & Date): <br />FT Previous determination(s). File no. and date of response letter: <br />❑ Other information (please specify): <br />IMPORTANT NOTE: The information recorded on this form has not necessarily been <br />verified by the Corps and should not be relied upon for later iurisdictional determinations. <br />l � Ocf Oct/ <br />Signature and date of <br />Regulatory Project Manager <br />(REQUIRED) <br />Signature and date of <br />person requesting preliminary JD <br />(REQUIRED, unless obtaining the <br />signature is impracticable) <br />OR <br />