My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-02_HYDROLOGY - C1980006
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1980006
>
2011-11-02_HYDROLOGY - C1980006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:42 PM
Creation date
11/9/2011 8:03:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Hydrology
Doc Date
11/2/2011
Doc Name
Nationwide Permit Number 21
From
Department of the Army Corps of Engineers
To
Energy Fuels Coal, Inc
Permit Index Doc Type
Other Surface Water
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Certification of Completed Walk <br />Corps File Number: <br />Name of Permittee: <br />Date of Issuance: <br />Expiration Date: <br />Upon completion of the activity authorized by this permit and any mitigation required by <br />the permit, sign this certification and return it to the following address: <br />U. S. Army Corps of Engineers <br />Denver Regulatory Office <br />9307 South Wadsworth Blvd. <br />Littleton, Colorado 80128 -6901 <br />Phone (303) 979 -4120 <br />Fax (303) 979 -0602 <br />Please note that your permitted activity is subject to a compliance inspection by a U. S. <br />Army Corps of Engineers representative. If you fail to comply with this permit you are <br />subject to permit suspension, modification, or revocation. <br />I hereby certify that the work authorized by the above referenced permit has been <br />completed in accordance with the terms and conditions of said permit, and required <br />mitigation was completed in accordance with the permit conditions. <br />Signature of Permittee <br />1 If your permit included wetlands monitoring and annual reports, these activities will continue after <br />submittal of this form until you are notified by the Denver Regulatory Office that your mitigation is <br />successful and monitoring reports are no longer required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.