Laserfiche WebLink
REASON FOR INSPECTION: <br />Normal I &E Program <br />BOND CALCULATION TYPE: <br />Complete Bond <br />BOND AMOUNT: <br />$41,140.00 <br />DATE OF COMPLAINT: <br />NA <br />POST INSP. CONTACTS: <br />None <br />JOINT INSP. AGENCY: <br />U.S. Bureau of Land Management <br />WEATHER: <br />Clear <br />f <br />S1 J CTO ' GNATURE: <br />( <br />- SIGNATURE DATE: <br />November 2, 2011 <br />MINE NAME: <br />Mid - Continent LST <br />MINE/PROSPECTING BM: <br />M- 1982 -121 <br />MINERAL: <br />Limestone <br />COUNTY: <br />Garfield <br />INSPECTION TYPE: <br />Monitoring <br />INSPECTOR(S): <br />Dustin M. Czapla <br />INSP. DATE: <br />October 12, 2011 <br />INSP. TIME: <br />09:30 <br />OPERATOR: <br />Calx Minerals, LLC <br />OPERATOR REPRESENTATIVE: <br />Justin Olin <br />TYPE OF OPERATION: <br />112c - Construction Regular Operation <br />M- I962_-12 t <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />MINERALS PROGRAM INSPECTION REPORT RECERVW <br />PHONE: (303) 866 -3567 NOV 9 4 2011 <br />LJM $on of Reclamation, <br />on, <br />The Division of Reclamation Minin and Safe has conducted an ins ection of the and S <br />� g t3' p m operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Financial Warranty <br />PROBLEM /POSSIBLE VIOLATION: Problem: The financial warranty is not adequate to reclaim the site in <br />accordance with the approved reclamation plan. This is a failure to maintain the proper financial warranty <br />amount to complete reclamation of the affected lands pursuant to C.R.S. 34- 32.5- 117(4)(b) of the Act. <br />CORRECTIVE ACTIONS: The operator shall submit adequate financial warranty, as determined by the Division. <br />The Division will send a separate surety increase notice to the operator regarding the increase of the financial <br />warranty. The operator will have 60 days from the date of the surety increase notice to post the additional <br />financial warranty. <br />CORRECTIVE ACTION DUE DATE: 1/02/12 <br />INSPECTION TOPIC: Signs & Markers <br />PROBLEM /POSSIBLE VIOLATION: Problem: The affected area boundary markers are missing or incorrectly <br />placed. This is a problem for failure to maintain boundary markers around the affected area as required by <br />Section 3.1.12(2) of the rule. <br />CORRECTIVE ACTIONS: The operator shall conduct a survey and replace the boundary markers in the correct <br />location(s). The operator shall provide proof to the Division that this has been done by the corrective action <br />date. <br />CORRECTIVE ACTION DUE DATE: 12/02/11 <br />Page 1 of 3 <br />