Laserfiche WebLink
Site: <br />Task description: <br />Mid - Continent LST Permit Action: 2011 Midterm Review Permit/Job #: M1982121 <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 320D L 9' -6" Stick Horsepower: <br />Attachment 1: ROPS Cab Weight (MT): <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />MATERIAL QUANTITIES <br />Initial volume: 278 <br />Loose volume: 278 <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty): <br />Basic Job Condition Description: <br />Secondary Job Condition within Basic Description: <br />Cycle Time Value: <br />Load Bucket Capacity <br />JOB TIME <br />Rated Capacity: <br />Bucket Fill Factor: <br />Adjusted Capacity: <br />Job Condition Correction Factors <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />Fleet size: 1 <br />Unit cost: <br />Total Fleet Cost/Hour: $109.00 <br />AND COST <br />HYDRAULIC EXCAVATOR WORK <br />Placement of loose material on production benches against highwall and fmish <br />grading of benches. <br />02A State: Colorado <br />11/1/2011 County: Garfield <br />DMC <br />Agency or organization name: DRMS <br />Source of estimated volume: Three benches approx 200'L x 25'H x 20'W (see drawing) <br />Source of estimated swell factor: Cat Handbook <br />0.90 <br />0.83 <br />0.75 <br />1.54 <br />0.675 <br />1.04 <br />$24.63 <br />$45.70 <br />$38.67 <br />$109.00 <br />Source <br />(CAT HB) <br />(1 shill/day) <br />multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />Utilization % <br />NA <br />100 <br />NA <br />CCY Swell factor: 1.000 <br />LCY <br />$0.912 /LCY Total job cost: <br />SEVERE <br />SEVERE <br />0.390 <br />Bucket Size Class: Medium <br />LCY (heaped) <br />Blasted rock - poorly blasted (60 - 75 %) 0.675 <br />LCY <br />159.92 <br />119.46 <br />119.46 <br />Excavator Total job time: <br />Site Altitude: 6800 feet <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Abbreviation: None <br />2.33 <br />$254.00 <br />Filename M121 -02a <br />148 <br />21.55 <br />1 per day <br />(CRG) <br />minutes <br />Hours <br />CIRCES Cost Estimating Software <br />