My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-02_REVISION - M1982121
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982121
>
2011-11-02_REVISION - M1982121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:25 AM
Creation date
11/8/2011 1:33:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982121
IBM Index Class Name
REVISION
Doc Date
11/2/2011
Doc Name
Notice of surety increase (SI-01)
From
DRMS
To
CalX Minerals, LLC
Type & Sequence
SI1
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip upper and lower access roads. <br />Site: Mid- Continent LST <br />Seismic: NA <br />Area: 2 <br />PROJECT IDENTIFICATION <br />Task #: 05A State: Colorado <br />Date: 11/1/2011 County: Garfield <br />User: DMC <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat DST - 8U <br />Ripper Attachment: 3 -Shank Ripper <br />Cost Breakdown: <br />Area: <br />Agency or organization name' DRMS <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />acres <br />Source of estimated quantity: <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />Average Ripping Depth: <br />Average Ripping Width: <br />Average Ripping Length: <br />Average Dozer Speed: <br />Average Maneuver Time: <br />Production per unit area: <br />Unit cost: $312.339 Per acre <br />Permit Action: 2011 Midterm Review Permit/Job #: M1982121 <br />$65.28 <br />$102.84 <br />$6.49 <br />$38.49 <br />$213.10 <br />$213.10 <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Selected estimating method: Area <br />Bank Volume: NA BCY <br />Rip Depth (ft): 2.00 Volume: 6,453 <br />NA feet/second <br />2.56 mph <br />7.08 degrees <br />500.00 feet <br />88.00 feet <br />0.25 feet <br />0.822 acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 0.822 Acres/hr <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Site Altitude: 6,800 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Adjusted Hourly Unit Production: 0.68 Acres/hr <br />Adjusted Hourly Fleet Production: 0.68 Acres/hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 2.93 Hours <br />Total job cost: $625.00 <br />Abbreviation: None <br />Filename: M121 -05a <br />NA <br />CIItCES Cost Estimating Software <br />BCY or CCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.