Laserfiche WebLink
Loader Worksheet Cont'd Task # 04C Page 2 of 2 <br />Load Bucket Capacity <br />Rated Capacity: 5.60 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - mixed moist aggregates (95 -100 %) 0.975 <br />Adjusted Capacity: 5.46 LCY <br />Job Condition Correction Factors <br />Site Altitude: 6800 feet <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />1.00 <br />0.83 <br />0.83 <br />Source <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />Total Travel Time: 0.1754 minutes <br />Total Cycle Time: 0.7404 minutes <br />Unadjusted Hourly Unit Production: 442.45 LCY/Hour <br />Adjusted Hourly Unit Production: 367.24 LCY/Hour <br />Adjusted Hourly Fleet Production: 734.47 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 2 Loader(s) Total job time: 2.18 Hours <br />Unit cost: $0.383 /LCY Total job cost: $613.00 <br />CIRCES Cost Estimating Software <br />