Laserfiche WebLink
Loader Worksheet Cont'd Task # 04A Page 2 of 2 <br />Job Condition Correction Factors <br />Site Altitude: 6800 feet <br />Altitude Adj: 1.00 <br />Job Efficiency: 0.83 <br />Net Correction: 0.83 <br />JOB TIME AND COST <br />Fleet size: 2 Loader(s) <br />Source <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />Total Travel Time: 0.1754 minutes <br />Total Cycle Time: 0.7004 minutes <br />Load Bucket Capacity <br />Rated Capacity: 5.60 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100 -120 %) 1.100 <br />Adjusted Capacity: 6.16 LCY <br />Unadjusted Hourly Unit Production: 527.69 LCY/Hour <br />Adjusted Hourly Unit Production: 437.98 LCY/Hour <br />Adjusted Hourly Fleet Production: 875.96 LCY/Hour <br />Total job time: <br />Unit cost: $0.321 /LCY Total job cost: $2,008.00 <br />7.14 Hours <br />CRCES Cost Estimating Software <br />