Laserfiche WebLink
Loader Worksheet Cont'd Task # 03C Page 2 of 2 <br />Load Bucket Capacity <br />Rated Capacity: 5.60 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - uniform aggregates to 1/8" (95 -100 %) 0.975 <br />Adjusted Capacity: 5.46 LCY <br />Job Condition Correction Factors <br />Site Altitude: 6800 feet <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />1.00 <br />0.83 <br />0.83 <br />Source <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />Total Travel Time: 0.8771 minutes <br />Total Cycle Time: 1.4021 minutes <br />Unadjusted Hourly Unit Production: 233.65 LCY/Hour <br />Adjusted Hourly Unit Production: 193.93 LCY/Hour <br />Adjusted Hourly Fleet Production: 387.86 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 2 Loader(s) Total job time: 4.99 Hours <br />Unit cost: $0.726 /LCY Total job cost: $1,405.00 <br />CIRCES Cost Estimating Software <br />