Laserfiche WebLink
Loader Worksheet Cont'd Task # 03A Page 2 of 2 <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />1.00 <br />0.83 <br />0.83 <br />Source <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />Total Travel Time: 0.1754 minutes <br />Total Cycle Time: 0.7004 minutes <br />Load Bucket Capacity <br />Rated Capacity: 5.60 LCY (heaped) <br />Bucket Fill Factor. 0.825 Blasted rock - avg. blasted (75 - 90 %) 0.825 <br />Adjusted Capacity: 4.62 LCY <br />Job Condition Correction Factors <br />Site Altitude: 6800 feet <br />Unadjusted Hourly Unit Production: 395.76 LCY/Hour <br />Adjusted Hourly Unit Production: 328.48 LCY/Hour <br />Adjusted Hourly Fleet Production: 656.97 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 2 Loader(s) Total job time: 41.47 Hours <br />Unit cost: $0.428 /LCY Total job cost: $11,672.00 <br />CIRCES Cost Estimating Software <br />