My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-02_REVISION - M1982121
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982121
>
2011-11-02_REVISION - M1982121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:25 AM
Creation date
11/8/2011 1:33:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982121
IBM Index Class Name
REVISION
Doc Date
11/2/2011
Doc Name
Notice of surety increase (SI-01)
From
DRMS
To
CalX Minerals, LLC
Type & Sequence
SI1
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loader Worksheet Cont'd Task # 03A Page 2 of 2 <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />1.00 <br />0.83 <br />0.83 <br />Source <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />Total Travel Time: 0.1754 minutes <br />Total Cycle Time: 0.7004 minutes <br />Load Bucket Capacity <br />Rated Capacity: 5.60 LCY (heaped) <br />Bucket Fill Factor. 0.825 Blasted rock - avg. blasted (75 - 90 %) 0.825 <br />Adjusted Capacity: 4.62 LCY <br />Job Condition Correction Factors <br />Site Altitude: 6800 feet <br />Unadjusted Hourly Unit Production: 395.76 LCY/Hour <br />Adjusted Hourly Unit Production: 328.48 LCY/Hour <br />Adjusted Hourly Fleet Production: 656.97 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 2 Loader(s) Total job time: 41.47 Hours <br />Unit cost: $0.428 /LCY Total job cost: $11,672.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.