Laserfiche WebLink
11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Existing roads will be used (see attached air photo). Minor brush clearing will be needed for <br />drill sites and access. Small pits will be constructed at each site to catch drill cuttings. No <br />ground water is expected, but if encountered, the pits will contain any fluids. <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 11.00 Average Width 20.00 (ft) Average Length 50.00 (ft) <br />B. Drill Holes: Quantity 11.00 D ep th 4 50.00 (ft) Diameter 6.00 (in) <br />C. Mud Pits: Quantity 11.00 A verage Width 4 (ft) Average Length 8 (ft) <br />Average Depth 3.00 (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />Note : Holes B, C, and D on original MD -2 map will not be drilled. BLM require a <br />cultural survey for those sites, so they will not be drilled at this time. Hole H will also <br />not be drilled. <br />F. Other Disturbances (please describe): <br />N/A <br />and antifreeze. <br />4 (FORM 2 - Public filing) <br />G. Indicate Chemicals and Fuels used or stored on site. List_type, quantity and method to store. <br />Used and contained in the equipment will be: diesel fuel, hydraulic oil, transmission fluid, <br />F. New Road(s): Length (ft) Width (ft) <br />Significantly Upgraded Road(s) Length 300 (ft) Width 16.00 (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />Note: minor clearing of brush and tree limbs will be needed on old roads and at drill <br />sites to allow safe access and work environment. Some minor dirt work and significant <br />dead tree removal will be needed to access sites A and O. <br />